Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
01/26/2024
Applicant:
Logan Weitzel
Description:
Renovation of existing Starbucks coffee shop. Exterior work to extend drive-thru bump-out, relocated drive-thru order point, 5 panel menu board & drive-thru order point canopy, new drive-thru window glazing, new drive-thru awning, and relocated drive-thru window.

Permit Reviews

Permit Number - TC-COM-0124-00181
Permit Status: Complete
Permit Description: Renovation of existing Starbucks coffee shop. Exterior work to extend drive-thru bump-out, relocated drive-thru order point, 5 panel menu board & drive-thru order point canopy, new drive-thru window glazing, new drive-thru awning, and relocated drive-thru window.
Start Date Submittal Complete Date Status  
04/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/29/2025 REQUIRES RESUBMIT Review Details
05/16/2025 COMMERCIAL REVIEW - FULL v.1 06/20/2025 APPROVED Review Details
11/05/2024 RESTAMP - COMMERCIAL v.1 11/06/2024 APPROVED Review Details
04/15/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/18/2025 APPROVED Review Details
03/04/2024 COMMERCIAL REVIEW - LIMITED v.2 03/25/2024 REQUIRES RESUBMIT Review Details
01/29/2024 COMMERCIAL REVIEW - LIMITED v.1 02/15/2024 REQUIRES RESUBMIT Review Details
05/01/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 05/02/2025 APPROVED Review Details
10/02/2024 COMMERCIAL REVIEW - LIMITED v.3 11/05/2024 APPROVED Review Details
11/07/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/07/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0124-00181
Permit Status: Complete
Permit Description: Renovation of existing Starbucks coffee shop. Exterior work to extend drive-thru bump-out, relocated drive-thru order point, 5 panel menu board & drive-thru order point canopy, new drive-thru window glazing, new drive-thru awning, and relocated drive-thru window.
Date Description Comments
02/12/2024 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
01/29/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
02/12/2024 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
02/12/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/15/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
02/12/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/15/2024 SPECIAL INSPECTION FOR SOILS IS REQUIRED
02/12/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0124-00181
Permite Description: Renovation of existing Starbucks coffee shop. Exterior work to extend drive-thru bump-out, relocated drive-thru order point, 5 panel menu board & drive-thru order point canopy, new drive-thru window glazing, new drive-thru awning, and relocated drive-thru window.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
03/19/2025 BULD - Electrical Clearance N/A Not Applicable
03/19/2025 COT - FCON - Alarm - Final N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0124-00181
Permit Description: Renovation of existing Starbucks coffee shop. Exterior work to extend drive-thru bump-out, relocated drive-thru order point, 5 panel menu board & drive-thru order point canopy, new drive-thru window glazing, new drive-thru awning, and relocated drive-thru window.
Total Completed Inspections - 11
Date Description Inspector Results Comments
02/12/2025 COT - LCPL - Rough Soil Passed 2-12-25, underground plumbing approved. okay to backfill
02/14/2025 COT - LCEL - Electrical Underground Passed 2/14/25: electrical underground per plans ok to proceed with backfill
03/11/2025 COT - LCPL - Plumbing Intermediate Passed
03/11/2025 COT - LCEL - Electrical Above Ceiling Passed
03/11/2025 COT - LCEL - Electrical Intermediate Passed
03/18/2025 COT - FCON - Fire - Final Passed
03/18/2025 COT - FCON - Sprinkler - Final Passed
03/18/2025 COT - LCEL - Electrical Final Passed 3-18-25, electrical final approved.
03/18/2025 COT - LCME - Mechanical Final Passed 3-18-25, mechanical and electrical finals approved.
03/19/2025 COT - LCPL - Plumbing Final Passed
03/19/2025 COT - LCBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SBUX_08783_NG_AR-ADDENDUM-STAMPED_V1.PDF DOCUMENTS VIEW
MITCHELL GC - STARBUCKS LAB RESULTS_V1.PDF DOCUMENTS VIEW
259735-STARBUCKS - IRVINGTON - I-19_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-IRVINGTON - I-19 - REVISED PLANS_V3.PDF DOCUMENTS VIEW