Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0124-00181
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
1209 W IRVINGTON RD UNIT 150
Address NEW:
1209 W IRVINGTON RD UNIT 150
Apply Date:
01/26/2024
Applicant:
Logan Weitzel
Description:
Renovation of existing Starbucks coffee shop. Exterior work to extend drive-thru bump-out, relocated drive-thru order point, 5 panel menu board & drive-thru order point canopy, new drive-thru window glazing, new drive-thru awning, and relocated drive-thru window.
Permit Reviews
Permit Number - TC-COM-0124-00181
Permit Status: Complete
Permit Description: Renovation of existing Starbucks coffee shop. Exterior work to extend drive-thru bump-out, relocated drive-thru order point, 5 panel menu board & drive-thru order point canopy, new drive-thru window glazing, new drive-thru awning, and relocated drive-thru window.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/29/2025 | REQUIRES RESUBMIT |
| 05/16/2025 | COMMERCIAL REVIEW - FULL v.1 | 06/20/2025 | APPROVED |
| 11/05/2024 | RESTAMP - COMMERCIAL v.1 | 11/06/2024 | APPROVED |
| 04/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/18/2025 | APPROVED |
| 03/04/2024 | COMMERCIAL REVIEW - LIMITED v.2 | 03/25/2024 | REQUIRES RESUBMIT |
| 01/29/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 02/15/2024 | REQUIRES RESUBMIT |
| 05/01/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 05/02/2025 | APPROVED |
| 10/02/2024 | COMMERCIAL REVIEW - LIMITED v.3 | 11/05/2024 | APPROVED |
| 11/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/07/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0124-00181
Permit Status: Complete
Permit Description: Renovation of existing Starbucks coffee shop. Exterior work to extend drive-thru bump-out, relocated drive-thru order point, 5 panel menu board & drive-thru order point canopy, new drive-thru window glazing, new drive-thru awning, and relocated drive-thru window.
| Date | Description | Comments |
|---|---|---|
| 02/12/2024 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
| 01/29/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 02/12/2024 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
| 02/12/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 02/15/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 02/12/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 02/15/2024 | SPECIAL INSPECTION FOR SOILS IS REQUIRED | |
| 02/12/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0124-00181
Permite Description: Renovation of existing Starbucks coffee shop. Exterior work to extend drive-thru bump-out, relocated drive-thru order point, 5 panel menu board & drive-thru order point canopy, new drive-thru window glazing, new drive-thru awning, and relocated drive-thru window.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 03/19/2025 | COT - FCON - Alarm - Final | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0124-00181
Permit Description: Renovation of existing Starbucks coffee shop. Exterior work to extend drive-thru bump-out, relocated drive-thru order point, 5 panel menu board & drive-thru order point canopy, new drive-thru window glazing, new drive-thru awning, and relocated drive-thru window.
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2025 | COT - LCPL - Rough Soil | Passed | 2-12-25, underground plumbing approved. okay to backfill | |
| 02/14/2025 | COT - LCEL - Electrical Underground | Passed | 2/14/25: electrical underground per plans ok to proceed with backfill | |
| 03/11/2025 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 03/11/2025 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 03/11/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 03/18/2025 | COT - FCON - Fire - Final | Passed | ||
| 03/18/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 03/18/2025 | COT - LCEL - Electrical Final | Passed | 3-18-25, electrical final approved. | |
| 03/18/2025 | COT - LCME - Mechanical Final | Passed | 3-18-25, mechanical and electrical finals approved. | |
| 03/19/2025 | COT - LCPL - Plumbing Final | Passed | ||
| 03/19/2025 | COT - LCBU - Building Final | Passed |