Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0124-00112
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
6720 S SANTA CLARA AV
Address NEW:
6720 S SANTA CLARA AV
Apply Date:
01/17/2024
Applicant:
Allan Gonzalez
Description:
Adding a new tep meter next to current meter, tep meter currently for main church building 6740 S Santa Clara ave
Permit Reviews
Permit Number - TC-COM-0124-00112
Permit Status: Inspections
Permit Description: Adding a new tep meter next to current meter, tep meter currently for main church building 6740 S Santa Clara ave
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/27/2024 | COMMERCIAL PDSD SIMPLE REVIEW v.2 | 03/15/2024 | REQUIRES RESUBMIT |
| 01/18/2024 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 02/01/2024 | REQUIRES RESUBMIT |
| 04/22/2024 | COMMERCIAL PDSD SIMPLE REVIEW v.3 | 04/29/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0124-00112
Permit Status: Inspections
Permit Description: Adding a new tep meter next to current meter, tep meter currently for main church building 6740 S Santa Clara ave
| Date | Description | Comments |
|---|---|---|
| 04/29/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0124-00112
Permite Description: Adding a new tep meter next to current meter, tep meter currently for main church building 6740 S Santa Clara ave
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2024 | BULD - Electrical Clearance | N/A | Re-inspection required | |
| 10/31/2024 | COT - LCEL - Electrical Intermediate | N/A | Not Ready | |
| 10/31/2024 | COT - LCEL - Electrical Underground | N/A | Re-inspection required | Conduit not per plan. Revise stating current size in the field. Provide proper depth to the top of the pipe. 10/31/2024 |