Permit: TC-COM-0124-00110
Permit Details
Apply Date:
01/17/2024
Applicant:
Robert Johnson
Description:
Exterior Fire damage
Permit Reviews
Permit Number - TC-COM-0124-00110
Permit Status: Withdrawn
Permit Description: Exterior Fire damage
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/25/2024 | COMMERCIAL REVIEW - FULL v.2 | 03/04/2024 | REQUIRES RESUBMIT |
01/18/2024 | COMMERCIAL REVIEW - FULL v.1 | 01/19/2024 | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TC-COM-0124-00110
Permit Status: Withdrawn
Permit Description: Exterior Fire damage
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
01/18/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 |
02/26/2024 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
02/26/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
03/04/2024 | AIR BALANCING REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-0124-00110
Permit Status: Withdrawn
Permit Description: Exterior Fire damage
Date | Description | Comments |
---|---|---|
02/26/2024 | Power Kill Reconnect Clearances Service upgrades, or changes to the electrical service or systems, that requires the electric utility to be disconnected and re-energized the same day, and requires City of Tucson Development Services to provide a clearance shall be coordinated with City of Tucson Inspections a minimum of two business days prior to the requested inspection date. If a custom time or after-hours inspection is required additional fees will apply. Contact (520) 837-4916 for inspection coordination. If utilizing the “the remote inspection” process, verify you have connectivity, schedule the inspection a couple days ahead to assure your appointment time, and no other coordination is necessary. |