Permit Details

Status:
Withdrawn
Type:
Commercial Building
Apply Date:
01/17/2024
Applicant:
Robert Johnson
Description:
Exterior Fire damage

Permit Reviews

Permit Number - TC-COM-0124-00110
Permit Status: Withdrawn
Permit Description: Exterior Fire damage
Start Date Submittal Complete Date Status  
01/25/2024 COMMERCIAL REVIEW - FULL v.2 03/04/2024 REQUIRES RESUBMIT Review Details
01/18/2024 COMMERCIAL REVIEW - FULL v.1 01/19/2024 IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0124-00110
Permit Status: Withdrawn
Permit Description: Exterior Fire damage
Total Outstanding Activity Conditions - 4
Date Name
01/18/2024 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
02/26/2024 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
02/26/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
03/04/2024 AIR BALANCING REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-0124-00110
Permit Status: Withdrawn
Permit Description: Exterior Fire damage
Date Description Comments
02/26/2024 Power Kill Reconnect Clearances Service upgrades, or changes to the electrical service or systems, that requires the electric utility to be disconnected and re-energized the same day, and requires City of Tucson Development Services to provide a clearance shall be coordinated with City of Tucson Inspections a minimum of two business days prior to the requested inspection date. If a custom time or after-hours inspection is required additional fees will apply. Contact (520) 837-4916 for inspection coordination. If utilizing the “the remote inspection” process, verify you have connectivity, schedule the inspection a couple days ahead to assure your appointment time, and no other coordination is necessary.