Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
01/16/2024
Applicant:
Description:
Coffee Wow Phase 1: Equipment and millwork modifications to existing coffee bar and lid bar.

Permit Reviews

Permit Number - TC-COM-0124-00091
Permit Status: Issued
Permit Description: Coffee Wow Phase 1: Equipment and millwork modifications to existing coffee bar and lid bar.
Start Date Submittal Complete Date Status  
04/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/12/2024 APPROVED Review Details
01/17/2024 COMMERCIAL REVIEW - LIMITED v.1 02/01/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0124-00091
Permit Status: Issued
Permit Description: Coffee Wow Phase 1: Equipment and millwork modifications to existing coffee bar and lid bar.
Date Description Comments
02/01/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
04/12/2024 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
04/12/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0124-00091
Permite Description: Coffee Wow Phase 1: Equipment and millwork modifications to existing coffee bar and lid bar.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/03/2024 BULD - Electrical Clearance N/A Not Applicable

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0124-00091
Permit Description: Coffee Wow Phase 1: Equipment and millwork modifications to existing coffee bar and lid bar.
Total Completed Inspections - 9
Date Description Inspector Results Comments
02/22/2024 COT - LCEL - Electrical Final Passed
03/13/2024 COT - FCON - Fire - Final Passed
03/13/2024 COT - LCBU - Building Final Passed
05/03/2024 COT - LCPL - Plumbing Final Passed
05/03/2024 ENGR Engineering Final Passed
05/06/2024 TRSP - ROW - Final/Close-Out Passed
05/03/2024 COT - LCEL - Electrical Above Ceiling Passed
05/03/2024 COT - LCPL - Plumbing Intermediate Passed
05/03/2024 COT - LCEL - Electrical Intermediate Passed

Documents

File Name Document Type  
23307 QT 1480 POTABLE WATER SYSTEM REPAIR SIGNED-2024-04-11_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-05-1480 COFFEEWOW PHASE 1_V1.PDF DOCUMENTS VIEW