Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
01/15/2024
Applicant:
Cody Mozena
Description:
BLDG 1 - PHASE 3A -Tenant Finish for Existing One-Story Single Sided Dock Warehouse / Distribution Building

Permit Reviews

Permit Number - TC-COM-0124-00085
Permit Status: Issued
Permit Description: BLDG 1 - PHASE 3A -Tenant Finish for Existing One-Story Single Sided Dock Warehouse / Distribution Building
Start Date Submittal Complete Date Status  
01/17/2024 COMMERCIAL REVIEW - FULL v.1 02/16/2024 APPROVED Review Details
08/13/2024 RESTAMP - COMMERCIAL v.1 08/15/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0124-00085
Permit Status: Issued
Permit Description: BLDG 1 - PHASE 3A -Tenant Finish for Existing One-Story Single Sided Dock Warehouse / Distribution Building
Total Outstanding Activity Conditions - 2
Date Name
01/22/2024 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
01/22/2024 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-0124-00085
Permit Status: Issued
Permit Description: BLDG 1 - PHASE 3A -Tenant Finish for Existing One-Story Single Sided Dock Warehouse / Distribution Building
Date Description Comments
01/16/2024 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
01/16/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0124-00085
Permite Description: BLDG 1 - PHASE 3A -Tenant Finish for Existing One-Story Single Sided Dock Warehouse / Distribution Building
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
08/16/2024 COT - HCPL - Plumbing Progress N/A Partial Pass Partial pass. Bathrooms #161, #202-#205. Okay to backfill. Shading required. 8/16/2024
08/23/2024 COT - HCEL - Electrical Progress N/A Partial Pass X1 1" schedule 40, x1 3/4", and x1 2" electrical underground for conference room. Okay to proceed progress areas. 8/23/2024
08/23/2024 COT - HCPL - Rough Soil N/A Canceled Canceled per contractor. 8/23/2024
08/27/2024 COT - HCBU - Preslab N/A Partial Pass Canceled per contractor. 8/23/2024
8/27/24: pour back at conference room, kitchen, bathroom on north side and bathroom at south end.

Documents

File Name Document Type  
2024-08-12 BELDEN PHASE IIIA DRAWING SET 3610 E VALENCIA RD_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-21180_01 - PHASE IIIA PERMIT SET 2024-01-12_V1.PDF DOCUMENTS VIEW