Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
01/11/2024
Applicant:
Description:
Commercial Office tenant improvement

Permit Reviews

Permit Number - TC-COM-0124-00076
Permit Status: Complete
Permit Description: Commercial Office tenant improvement
Start Date Submittal Complete Date Status  
03/01/2024 COMMERCIAL REVIEW - FULL v.2 03/04/2024 APPROVED Review Details
05/15/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/17/2024 APPROVED Review Details
01/11/2024 COMMERCIAL REVIEW - FULL v.1 02/28/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0124-00076
Permit Status: Complete
Permit Description: Commercial Office tenant improvement
Date Description Comments
03/01/2024 AIR BALANCING REPORT IS REQUIRED.
01/11/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
03/01/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0124-00076
Permite Description: Commercial Office tenant improvement
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
05/10/2024 COT - HCEL - Electrical Final N/A Not Applicable
04/30/2024 COT - HCME - Mechanical Above Ceiling N/A Not Ready Please seismic air diffusers
COT - FCON - Alarm - Final N/A Not Ready
COT - FCON - Fire - Final N/A Not Ready
COT - FCON - Sprinkler - Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0124-00076
Permit Description: Commercial Office tenant improvement
Total Completed Inspections - 16
Date Description Inspector Results Comments
04/01/2024 COT - HCBU - Framing Passed
04/01/2024 COT - HCEL - Electrical Intermediate Passed
04/01/2024 COT - HCPL - Plumbing Intermediate Passed
04/30/2024 COT - HCME - Mechanical Intermediate Passed
05/10/2024 COT - HCBU - Building Above Ceiling Passed
05/10/2024 COT - HCEL - Electrical Above Ceiling Passed
05/10/2024 COT - HCME - Mechanical Above Ceiling Passed
05/10/2024 COT - HCME - Mechanical Final Passed
05/10/2024 COT - HCPL - Plumbing Above Ceiling Passed
05/14/2024 COT - FCON - Alarm - Final Passed
05/14/2024 COT - FCON - Fire - Final Passed
05/14/2024 TRSP - ROW - Final/Close-Out Passed
05/14/2024 COT - FCON - Sprinkler - Final Passed
05/14/2024 COT - HCBU - Building Final Passed
05/14/2024 COT - HCPL - Plumbing Final Passed
05/15/2024 ENGR Engineering Final Passed It appears that this job is completed. No dumpster on site and the Porta-Jon was removed while I was here. Reached out to the contact noted but no call back as of yet. This TI was a 3rd floor remodel so I would be looking for anything on the exterior that would be pertaining to the construction process, dumpster, staging area, Porta Jon etc. Everything looks cleaned and removed from site.

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
7937 PROGRESSIVE CHLORINATION REPORT 5.15.2024-2024-05-15_V1.PDF DOCUMENTS VIEW
7937 TAB REPORT - PROGRESSIVE 5.9.2024_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-1_PLANSET_V1_V1.PDF DOCUMENTS VIEW