Permit: TC-COM-0124-00054
Permit Details
Apply Date:
01/10/2024
Applicant:
Robert Horne
Description:
new unisex restroom in existing second floor space
Permit Reviews
Permit Number - TC-COM-0124-00054
Permit Status: Issued
Permit Description: new unisex restroom in existing second floor space
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/13/2024 | APPROVED |
01/11/2024 | COMMERCIAL REVIEW - FULL v.1 | 02/13/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0124-00054
Permit Status: Issued
Permit Description: new unisex restroom in existing second floor space
Date | Description | Comments |
---|---|---|
02/13/2024 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
01/11/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
02/13/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0124-00054
Permit Description: new unisex restroom in existing second floor space
Total Completed Inspections - 16
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/13/2024 | COT - HCBU - Framing | Passed | Framing for ADA restroom is complete, plumbing, mechanical, and electrical rough-in are complete. Okay to proceed with drywall installation. | |
03/13/2024 | COT - HCEL - Electrical Above Ceiling | Passed | Framing for ADA restroom is complete, plumbing, mechanical, and electrical rough-in are complete. Okay to proceed with drywall installation. | |
03/13/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | Framing for ADA restroom is complete, plumbing, mechanical, and electrical rough-in are complete. Okay to proceed with drywall installation. | |
03/13/2024 | COT - HCPL - Plumbing Intermediate | Passed | Plumbing rough-in for ADA Restroom is complete and under pressure test for supply water and DWV piping. Okay to proceed with drywall installation. | |
05/02/2024 | COT - FCON - Fire - Final | Passed | ||
05/02/2024 | COT - FCON - Sprinkler - Final | Passed | ||
05/02/2024 | ENGR Engineering Final | Passed | interior to building, instructed to pass inspection by D. Roberts. | |
05/02/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
05/03/2024 | COT - HCEL - Electrical Final | Passed | ||
05/03/2024 | COT - HCBU - Building Final | Passed | ||
05/03/2024 | COT - HCME - Mechanical Final | Passed | ||
05/03/2024 | COT - HCPL - Plumbing Final | Passed | ||
05/24/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
06/05/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
06/05/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
06/05/2024 | COT - HCME - Mechanical Above Ceiling | Passed |