Permit Details

Status:
Issued
Type:
Commercial Building
Address NEW:
3350 E VALENCIA RD
Apply Date:
01/05/2024
Applicant:
Bryce Davis
Description:
Replace existing water cooled chillers with new air cooled chillers

Permit Reviews

Permit Number - TC-COM-0124-00028
Permit Status: Issued
Permit Description: Replace existing water cooled chillers with new air cooled chillers
Start Date Submittal Complete Date Status  
01/05/2024 COMMERCIAL PDSD SIMPLE REVIEW v.1 01/19/2024 REQUIRES RESUBMIT Review Details
01/25/2024 COMMERCIAL PDSD SIMPLE REVIEW v.2 02/09/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0124-00028
Permit Status: Issued
Permit Description: Replace existing water cooled chillers with new air cooled chillers
Total Outstanding Activity Conditions - 7
Date Name
01/19/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/19/2024 SPECIAL INSPECTION FOR WELDING IS REQUIRED.
02/09/2024 Post-Installed Anchor Inspection Report is required.
02/09/2024 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
02/09/2024 SPECIAL INSPECTION FOR FABRICATORS IS REQUIRED
02/09/2024 SPECIAL INSPECTION FOR STRUCTURAL STEEL IS REQUIRED
02/09/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.

Conditions

Permit Number - TC-COM-0124-00028
Permit Status: Issued
Permit Description: Replace existing water cooled chillers with new air cooled chillers
Date Description Comments
01/05/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0124-00028
Permite Description: Replace existing water cooled chillers with new air cooled chillers
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
06/20/2024 COT - BULD - SWG Clearance N/A Not Applicable
06/20/2024 BULD - Electrical Clearance N/A Not Applicable
10/24/2024 COT - LCBU - Building Final N/A Canceled Canceled per contractor. 10/24/2024
10/24/2024 COT - LCME - Mechanical Final N/A Canceled Canceled per contractor. 10/24/2024
10/24/2024 COT - LCEL - Electrical Final N/A Canceled Canceled per contractor. 10/24/2024

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0124-00028
Permit Description: Replace existing water cooled chillers with new air cooled chillers
Total Completed Inspections - 8
Date Description Inspector Results Comments
06/20/2024 COT - LCBU - Excavation/Rebar/Zoning Passed Approved foundation / reinforcement at Chiller slab and enclosure, okay to pour foundations
06/20/2024 COT - LCEL - Electrical Underground Passed Approved underground electric from Chiller location to existing transformer location, okay to backfill progress areas
06/20/2024 COT - LCEL - Grounding/Bonding Passed
05/15/2025 COT - LCEL - Electrical Intermediate Passed 5-15-25, verified SES 2 per approved plans. Okay to continue with construction.
05/16/2025 BULD - Electrical Clearance Passed 5-16-25, verbal INCR clearance given to Marcia from TEP at 1418 hours to energized SES 2 (Gear Box).
09/10/2025 COT - LCBU - Building Final Passed 9-10-25: building final approved.
Note: See pending conditions. Submit all 3rd party inspection reports as attachments on your permit to the city for review/approval.
09/10/2025 COT - LCME - Mechanical Final Passed 9-10-25: mechanical final approved.
Note: See pending conditions. Submit all 3rd party inspection reports as attachments on your permit to the city for review/approval.
09/10/2025 COT - LCEL - Electrical Final Passed 9-10-25: electrical final approved.
Note: See pending conditions. Submit all 3rd party inspection reports as attachments on your permit to the city for review/approval.