Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0123-00529
Permit Details
Apply Date:
01/24/2023
Applicant:
Tucson Water
Description:
Tucson Water SCADA upgrades to existing well site. Modifications to existing above grade piping. Extend existing electrical shade structure.
Permit Reviews
Permit Number - TC-COM-0123-00529
Permit Status: Issued
Permit Description: Tucson Water SCADA upgrades to existing well site. Modifications to existing above grade piping. Extend existing electrical shade structure.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/07/2023 | COMMERCIAL REVIEW - FULL v.1 | 03/06/2023 | APPROVED |
Conditions
Permit Number - TC-COM-0123-00529
Permit Status: Issued
Permit Description: Tucson Water SCADA upgrades to existing well site. Modifications to existing above grade piping. Extend existing electrical shade structure.
Date | Description | Comments |
---|---|---|
03/06/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0123-00529
Permite Description: Tucson Water SCADA upgrades to existing well site. Modifications to existing above grade piping. Extend existing electrical shade structure.
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/15/2024 | BULD - Electrical Clearance | N/A | Not Applicable | |
03/15/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
03/28/2024 | ENGR Engineering Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0123-00529
Permit Description: Tucson Water SCADA upgrades to existing well site. Modifications to existing above grade piping. Extend existing electrical shade structure.
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/15/2024 | COT - LCEL - Electrical Final | Passed | ||
03/15/2024 | COT - LCPL - Plumbing Final | Passed | ||
03/15/2024 | COT - LCME - Mechanical Final | Passed | ||
03/20/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
04/03/2024 | COT - LCBU - Building Final | Passed |