Permit: TC-COM-0123-00444
Permit Details
Apply Date:
01/10/2023
Applicant:
Denny Hawkins
Description:
Service riser wires are completely bare when leaving the weather head. Need to remove existing wires and replace with new. Service is 400amp single phase 120/240volt. TEP needs a clearance so service can be turned back on. THIS IS FOR UNIT #9.
Permit Reviews
Permit Number - TC-COM-0123-00444
Permit Status: Issued
Permit Description: Service riser wires are completely bare when leaving the weather head. Need to remove existing wires and replace with new.
Service is 400amp single phase 120/240volt. TEP needs a clearance so service can be turned back on. THIS IS FOR UNIT #9.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/12/2023 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 01/12/2023 | APPROVED |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0123-00444
Permit Description: Service riser wires are completely bare when leaving the weather head. Need to remove existing wires and replace with new.
Service is 400amp single phase 120/240volt. TEP needs a clearance so service can be turned back on. THIS IS FOR UNIT #9.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/01/2023 | BULD - Electrical Clearance | Passed | Approved, INCR Clearance was called into TEP unit #9 (power-kill) | |
| 03/01/2023 | COT - LCEL - Electrical Final | Passed | #9 |