Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
01/05/2023
Applicant:
Robert Sargenti
Description:
THIS PROJECT IS AN INTERIOR TENANT FIT-OUT FOR SEPHORA OF APPROXIMATELY 4,281 SF. WORK INCLUDES BUT IS NOT LIMITED TO, CONSTRUCTION OF STOREFRONTS, INTERIOR WALLS / PARTITIONS, WALL FIXTURES, FLOORING, CEILING, LIGHT FIXTURES AND PARTIAL MECHANICAL, ELECTRICAL, AND PLUMBING. NEW REPAINTING AT EXISTING STOREFRONT TO REMAIN

Permit Reviews

Permit Number - TC-COM-0123-00415
Permit Status: Complete
Permit Description: THIS PROJECT IS AN INTERIOR TENANT FIT-OUT FOR SEPHORA OF APPROXIMATELY 4,281 SF. WORK INCLUDES BUT IS NOT LIMITED TO, CONSTRUCTION OF STOREFRONTS, INTERIOR WALLS / PARTITIONS, WALL FIXTURES, FLOORING, CEILING, LIGHT FIXTURES AND PARTIAL MECHANICAL, ELECTRICAL, AND PLUMBING. NEW REPAINTING AT EXISTING STOREFRONT TO REMAIN
Start Date Submittal Complete Date Status  
04/06/2023 RESTAMP - COMMERCIAL v.1 04/07/2023 APPROVED Review Details
12/19/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/19/2023 APPROVED Review Details
08/31/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/11/2023 APPROVED Review Details
01/25/2023 COMMERCIAL REVIEW - FULL v.1 04/06/2023 APPROVED Review Details

Conditions

Permit Number - TC-COM-0123-00415
Permit Status: Complete
Permit Description: THIS PROJECT IS AN INTERIOR TENANT FIT-OUT FOR SEPHORA OF APPROXIMATELY 4,281 SF. WORK INCLUDES BUT IS NOT LIMITED TO, CONSTRUCTION OF STOREFRONTS, INTERIOR WALLS / PARTITIONS, WALL FIXTURES, FLOORING, CEILING, LIGHT FIXTURES AND PARTIAL MECHANICAL, ELECTRICAL, AND PLUMBING. NEW REPAINTING AT EXISTING STOREFRONT TO REMAIN
Date Description Comments
04/04/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
04/04/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/04/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
04/04/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/04/2023 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
04/04/2023 Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection.
04/04/2023 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0123-00415
Permite Description: THIS PROJECT IS AN INTERIOR TENANT FIT-OUT FOR SEPHORA OF APPROXIMATELY 4,281 SF. WORK INCLUDES BUT IS NOT LIMITED TO, CONSTRUCTION OF STOREFRONTS, INTERIOR WALLS / PARTITIONS, WALL FIXTURES, FLOORING, CEILING, LIGHT FIXTURES AND PARTIAL MECHANICAL, ELECTRICAL, AND PLUMBING. NEW REPAINTING AT EXISTING STOREFRONT TO REMAIN
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
05/30/2023 COT - HCEL - Electrical Intermediate N/A Partial Pass for interior walls
07/12/2023 COT - BULD - SWG Clearance N/A Not Applicable no gas service
COT - FCON - Fire - Final N/A Not Ready
01/02/2024 ENGR Engineering Final N/A Partial Pass Partial approval of the site is given at this time due to the handicap spots for this building or noncompliant for slope and grade. Will verify that this site has been constructed per the approved development package plan prior to considering this one for a full and final approval.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0123-00415
Permit Description: THIS PROJECT IS AN INTERIOR TENANT FIT-OUT FOR SEPHORA OF APPROXIMATELY 4,281 SF. WORK INCLUDES BUT IS NOT LIMITED TO, CONSTRUCTION OF STOREFRONTS, INTERIOR WALLS / PARTITIONS, WALL FIXTURES, FLOORING, CEILING, LIGHT FIXTURES AND PARTIAL MECHANICAL, ELECTRICAL, AND PLUMBING. NEW REPAINTING AT EXISTING STOREFRONT TO REMAIN
Total Completed Inspections - 14
Date Description Inspector Results Comments
05/10/2023 COT - HCPL - Rough Soil Passed Underground plumbing is installed and under water test. Okay to backfill and compact for slab pour back.
05/12/2023 COT - HCEL - Electrical Underground Passed Electrical underground is for showcases through the store. Approved. Okay to cover. 5/12/2023
05/30/2023 COT - HCBU - Framing Passed
05/31/2023 COT - HCPL - Plumbing Intermediate Passed 5-31-23: Plumbing rough-in is complete. Okay to insulate and sheet rock walls.
07/12/2023 BULD - Electrical Clearance Passed Approved for unit #150 (2 service meters)- ECO Clearance to TEP is required for unit #150 M1 and M2
08/04/2023 COT - FCON - Sprinkler - Final Passed
08/04/2023 COT - HCME - Mechanical Intermediate Passed
08/04/2023 COT - HCPL - Plumbing Final Passed
08/17/2023 COT - HCEL - Electrical Final Passed
08/17/2023 COT - HCME - Mechanical Final Passed
08/17/2023 COT - HCBU - Building Final Passed recommend C/O
12/20/2023 COT - FCON - Alarm - Final Passed
12/19/2023 TRSP - ROW - Final/Close-Out Passed
02/23/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
CONS-STANTEC_APPROVED_PLANS_V1.PDF DOCUMENTS VIEW
ME LINK FINAL AIR BALANCE 12-1-23_V1.PDF DOCUMENTS VIEW
23H0617 SAMPLE2COC REV TUCSON PDF FINAL 08 10 23 1434_V1.PDF DOCUMENTS VIEW
SEPHORA - WATER TEST _V1.PDF DOCUMENTS VIEW
SEPHORA TUCSON INSPECTION REPORTS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
TUCSON LANDING ELEC COMCHECK_V1.PDF DOCUMENTS VIEW
CONS-TUCSON LANDING_2024_NEW_221230_2022_CD_PERMIT SET__V1.PDF DOCUMENTS VIEW
SEPHORA TUCSON - STR CALCS - PIPP RACKING CALCS PO 66160 CB_V1.PDF DOCUMENTS VIEW
CONS-STANTEC_APPROVED_PLANS_V1.PDF DOCUMENTS VIEW
TUCSON LANDING MECH COMCHECK_V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_CALCS_STRUCT_BLDG_V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_ENERGY_MECH_V1.PDF DOCUMENTS VIEW
SEPHORA PSA_V1.PDF DOCUMENTS VIEW
STANTEC_SPEC_INSP_CET-2023-04-04_V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_CALCS_STRUCT_RACKING_V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_ENERGY_ELECT_V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_CALCS_STRUCT_BLDG_V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_ENERGY_MECH_V1.PDF DOCUMENTS VIEW
STANTEC_SPEC_INSP_CET-2023-04-04_V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_CALCS_STRUCT_RACKING_V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_ENERGY_ELECT_V1.PDF DOCUMENTS VIEW
SEPHORA PSA_V1.PDF DOCUMENTS VIEW