Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Inspections Complete
Type:
Certificate of Occupancy
Address:
3301 E GLOBAL LP
Address NEW:
3301 E GLOBAL LP
Apply Date:
08/26/2026
Applicant:
Brandy Burke
Description:
THE SCOPE OF WORK FOR THIS PROJECT INCLUDES DEMOLITION AND NEW WORK FOR BOTH INTERIOR AND EXTERIOR. MAJORITY OF THE WORK WILL BE INTERIOR WORK. INTERIOR DEMOLITION WORK INCLUDES REMOVAL OF WALLS, LIGHTING, FLOORING, BASEBOARD, ELECTRICAL AND HVAC FOR NEW OFFICES, CONFERENCE ROOMS AND OPERABLE PARTITIONS. EXTERIOR DEMOLITION WORK INCLUDES MODIFICATION TO 2 EXISTING DECKS TO PROVIDE NEW RAMPS AND EXTERIOR WALLS FOR A NEW STORAGE ROOM. EXISTING TILT UP CONCRETE WALLS TO HAVE NEW OPENINGS FOR EXTERIOR WINDOWS. NEW INTERIOR WORK INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW WINDOWS, MILLWORK, DOORS AND DOOR HARDWARE. EXISTING CEILING TILES, DOORS, DOOR HARDWARE, REGISTERS, LIGHT FIXTURES, LIGHT SWITCHES, FLOOR CARPET TILES TO BE REUSED AS MUCH AS POSSIBLE. NEW EXTERIOR WINDOWS TO BE LOCATED IN THE EXISTING TILT UP CONCRETE WALLS. NEW EXTERIOR STORAGE ROOM TO BE LOCATED UNDER EXISTING METAL ROOF.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-CFO-0826-00153
Permit Description: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES DEMOLITION AND NEW WORK FOR BOTH INTERIOR AND EXTERIOR. MAJORITY OF THE WORK WILL BE INTERIOR WORK. INTERIOR DEMOLITION WORK INCLUDES REMOVAL OF WALLS, LIGHTING, FLOORING, BASEBOARD, ELECTRICAL AND HVAC FOR NEW OFFICES, CONFERENCE ROOMS AND OPERABLE PARTITIONS. EXTERIOR DEMOLITION WORK INCLUDES MODIFICATION TO 2 EXISTING DECKS TO PROVIDE NEW RAMPS AND EXTERIOR WALLS FOR A NEW STORAGE ROOM. EXISTING TILT UP CONCRETE WALLS TO HAVE NEW OPENINGS FOR EXTERIOR WINDOWS. NEW INTERIOR WORK INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW WINDOWS, MILLWORK, DOORS AND DOOR HARDWARE. EXISTING CEILING TILES, DOORS, DOOR HARDWARE, REGISTERS, LIGHT FIXTURES, LIGHT SWITCHES, FLOOR CARPET TILES TO BE REUSED AS MUCH AS POSSIBLE. NEW EXTERIOR WINDOWS TO BE LOCATED IN THE EXISTING TILT UP CONCRETE WALLS. NEW EXTERIOR STORAGE ROOM TO BE LOCATED UNDER EXISTING METAL ROOF.
Total Completed Inspections - 3
Date Description Inspector Results Comments
08/31/2026 Consultation SITE Passed
08/31/2026 COT - HCBU - TCO Passed
08/31/2026 Inspection needed to issue a TCO prior to permit completion Passed