Permit: TC-CFO-0824-00170
Permit Details
Status:
Issued
Type:
Certificate of Occupancy
Address:
1131 N 6TH AV BLDG 1
Address NEW:
1131 N 6TH AV BLDG 1
Apply Date:
08/14/2024
Applicant:
Description:
THE WORK OF THIS PROJECT INCLUDES CONSTRUCTION OF A NEW BUILDING (BUILDING 2) FOR EDUCATIONAL USE AND MINOR MODIFICATIONS TO THE EXTERIOR AND INTERIOR OF THE EXISTING BUILDING (BUILDING 1). THE NEW BUILDING (BUILDING 2) WILL BE WOOD STUD AND STUCCO. EXTERIOR SITE WORK WILL INCLUDE THE ADDITION OF A RAMP AND STAIR, PARKING, SITE WALLS AND SIDEWALK . THE EXISTING BUILDING (BUILDING 1) WILL HAVE A CHANGE OF USE FROM SINGLE FAMILY TO OFFICE USE. BATHROOMS WILL BE REMODLED TO COMPLY WITH ADA. DOORS ALONG THE EGRESS PATHWAY WILL BE MODIFIED TO COMPLY WITH ADA
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-CFO-0824-00170
Permite Description: THE WORK OF THIS PROJECT INCLUDES CONSTRUCTION OF A NEW BUILDING (BUILDING 2) FOR EDUCATIONAL USE AND MINOR MODIFICATIONS TO THE EXTERIOR AND INTERIOR OF THE EXISTING BUILDING (BUILDING 1).
THE NEW BUILDING (BUILDING 2) WILL BE WOOD STUD AND STUCCO. EXTERIOR SITE WORK WILL INCLUDE THE ADDITION OF A RAMP AND STAIR,
PARKING, SITE WALLS AND SIDEWALK .
THE EXISTING BUILDING (BUILDING 1) WILL HAVE A CHANGE OF USE FROM SINGLE FAMILY TO OFFICE USE. BATHROOMS WILL BE REMODLED TO COMPLY WITH ADA. DOORS ALONG THE EGRESS PATHWAY WILL BE MODIFIED TO COMPLY WITH ADA
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2024 | COT - HCBU - TCO | N/A | Canceled | Contractor cancelled. Will reschedule for 22 August. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-CFO-0824-00170
Permit Description: THE WORK OF THIS PROJECT INCLUDES CONSTRUCTION OF A NEW BUILDING (BUILDING 2) FOR EDUCATIONAL USE AND MINOR MODIFICATIONS TO THE EXTERIOR AND INTERIOR OF THE EXISTING BUILDING (BUILDING 1).
THE NEW BUILDING (BUILDING 2) WILL BE WOOD STUD AND STUCCO. EXTERIOR SITE WORK WILL INCLUDE THE ADDITION OF A RAMP AND STAIR,
PARKING, SITE WALLS AND SIDEWALK .
THE EXISTING BUILDING (BUILDING 1) WILL HAVE A CHANGE OF USE FROM SINGLE FAMILY TO OFFICE USE. BATHROOMS WILL BE REMODLED TO COMPLY WITH ADA. DOORS ALONG THE EGRESS PATHWAY WILL BE MODIFIED TO COMPLY WITH ADA
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2024 | Consultation SITE | Passed |