Permit Details

Status:
Complete
Type:
Certificate of Occupancy
Apply Date:
06/24/2024
Applicant:
Description:
THIS PORTION OF THE PROJECT CONSISTS OF ONLY THE TENANT IMPROVEMENT (TI) PACKAGE FOR A PRE-ENGINEERED METAL BUIDLING. SEPARATE PACKAGES FOR THE FOUNDATION, SHELL AND DEVELOPEMENT PACKAGE ARE UNDER SEPARATE PERMITS.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-CFO-0624-00132
Permite Description: THIS PORTION OF THE PROJECT CONSISTS OF ONLY THE TENANT IMPROVEMENT (TI) PACKAGE FOR A PRE-ENGINEERED METAL BUIDLING. SEPARATE PACKAGES FOR THE FOUNDATION, SHELL AND DEVELOPEMENT PACKAGE ARE UNDER SEPARATE PERMITS.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
07/11/2024 COT - HCBU - TCO N/A Partial Pass 6/25/24: will be called in with T.I final. Pending fire for engineering final for shell permit.
7/11/24: Ok for LEVEL 4 TCO
07/11/2024 Consultation SITE N/A Partial Pass TCO2 ready, for a TCO4 you will need to complete the center yard between building so no equipment is being used and same for the northern yard with the fence closed off for the dob park area and the future basketball court area. No equipment between construction fence and school fence on fire road.