Permit Details
Status:
Issued
Type:
Certificate of Occupancy
Apply Date:
06/18/2024
Applicant:
Carlos De Alva
Description:
REQUEST DESCRIPTION FOR LEVEL 3 TCO 1ST FLOOR ONLY 575 East River Rd is a (2) phase project. 1st phase encompasses the entire 1st floor scope of work per plan. 2nd phase encompasses all 2nd floor scope of work per plan. The 1st phase has reached completion and all required inspections and specifications have been passed. THE SPECIFICATION FOR THE WATER CHLORINATION REPORT, PERTAINS ONLY TO THE 2ND FLOOR SCOPE OF WORK. WE ARE NOT DOING ANY PLUMBING DURING THE 1ST FLOOR/1ST PHASE. When the 2nd phase begins, the entire 2nd floor will be construction personnel only, and will have construction access only at the stairwell and the elevator. Both the Engineering Department and the Building Inspection department with City of Tucson have cleared the 1st floor ONLY for level 3 TCO. The Tucson Fire Department passed our 1st floor sprinkler and alarm finals.