Permit: T99PL02061
Permit Details
Status:
Final
Type:
MULTI FAMILY OTHER
Address:
3420 E FLOWER ST 01
Address NEW:
3420 E FLOWER ST 01
Apply Date:
09/21/1999
Applicant:
AMY NORMAN
Description:
PLUMBING
Contractors:
- PHILIPS PLUMBING ,
Completed Inspections
Permit Status: Final
Permit Number: T99PL02061
Permit Description: PLUMBING
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/1999 | PLUMBING - SEWER HCS CONNECT | TRINIVJR | Approved | ADDTL COMMS - 1. SOIL WATER TEST OK 2. HCS CONNECTION OK 3. YARD WATER LINE OK 4. OK TO BACKFILL BLDG (1) ONLY 5. WILL REQUIRE REVISED AND APPROVED DRAWING ON WASTE AND VENT SYSTEM BEFORE FINAL. ROUGH PLDG NOT TO PLAN |
| 09/22/1999 | PLUMBING - YARD WTR LINE/TEST | TRINIVJR | Approved | ADDTL COMMS - 1. SOIL WATER TEST OK 2. HCS CONNECTION OK 3. YARD WATER LINE OK 4. OK TO BACKFILL BLDG (1) ONLY 5. WILL REQUIRE REVISED AND APPROVED DRAWING ON WASTE AND VENT SYSTEM BEFORE FINAL. ROUGH PLDG. NOT TO PLAN |
| 09/22/1999 | PLUMBING - ROUGH, SOIL | TRINIVJR | Approved | ADDTL COMMS - 1. SOIL WATER TEST OK 2. HCS CONNECTION OK 3. YARD WATER LINE OK 4. OK TO BACKFILL BLDG (1) ONLY 5. WILL REQUIRE REVISED AND APPROVED DRAWING ON WASTE AND VENT SYSTEM BEFORE FINAL. ROUGH PLDG NOT TO PLAN |
| 12/17/1999 | PLUMBING - INTERMEDIATE | TRINIVJR | Approved | ADDTL COMMS - 1. WASTE AND VENT SYSTEM OK 2. OVERHEAD WATER DISTRIBUTION OK 3. GAS PRESSURE TEST OK 4. OK TO DRYWALL |