Permit: T99CM02293
Permit Details
Apply Date:
05/12/1999
Applicant:
REPP CONSTRUCTION ,
Description:
SFR
Contractors:
- REPP CONSTRUCTION ,
Completed Inspections
Permit Status: Final
Permit Number: T99CM02293
Permit Description: SFR
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/07/1999 | PLUMBING - ROUGH, SOIL | MCAPISTR | Approved | IVRS - Inspection 0000* |
| 09/07/1999 | PLUMBING - ROUGH, SOIL | MCAPISTR | Approved | ADDTL COMMS - WITH MINOR CHANGES IN PIPE ROUTING |
| 10/29/1999 | ELECTRIC - FINAL | MSNYDER | Approved | PARTIAL APPROVAL |
| 10/29/1999 | ELECTRIC - FINAL | MSNYDER | Approved | ADDTL COMMS - 1. DOUBLE LUGGED WIRES IN PANEL TO BE SAME 2. SIZE AND 2 MAX PER LUG 3. INSTALL RECEPT S. SIDE 4. PLUG HOLE AT PANEL. |
| 10/29/1999 | BUILDING - FINAL | MSNYDER | Approved | PARTIAL APPROVAL |
| 10/29/1999 | BUILDING - FINAL | MSNYDER | Approved | ADDTL COMMS - 5. PT SLAB TAG AT WATER MAIN. 6. FIRE TAPE FURNACE FLUE IN GARAGE. 7. CAULK FIRE PLACES AND HOLD OPWNS NEEDED ON DAMPERS. |