Permit: T99CM01917
Permit Details
Apply Date:
04/22/1999
Applicant:
DAVID EVANS & ASSOC
Description:
SITE REVIEW/AUTO PARTS STORE
Contractors:
- COMBS CONSTRUCTION INC , FRED
Completed Inspections
Permit Status: Final
Permit Number: T99CM01917
Permit Description: SITE REVIEW/AUTO PARTS STORE
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/1999 | PLUMBING - SEWER HCS CONNECT | TRINIVJR | Approved | ADDTL COMMS - 1. SOIL WATER TEST OK 2. SITE SEWER WATER TEST OK 3. WATER SERVICE FROM METER TO BLDG OK 4. OK TO BACKFILL TRENCHES 5. NOTE: UNDERGROUND ROUGH IN MUST HAVE PLAN CHANGE AND CITY APROVAL BEFORE FINAL. |
| 07/15/1999 | PLUMBING - YARD WTR LINE/TEST | TRINIVJR | Approved | ADDTL COMMS - 1. WATER SERVICE FROM METER TO BLDG OK 2. NOTE: WILL NEED CERTIFICATION AND TEST ON BACKFLOW PREVENTER @ FINAL |
| 07/15/1999 | PLUMBING - ROUGH, SOIL | TRINIVJR | Approved | ADDTL COMMS - 1. SOIL WATER TEST OK 2. SITE SEWER WATER TEST OK 3. WATER SERVICE FROM METER TO BLDG OK 4. OK TO BACKFILL TRENCHES 5. NOTE: UNDERGROUND ROUGH IN MUST HAVE PLAN CHANGE AND CITY APPROVAL BEFORE FINAL. |
| 07/28/1999 | PLUMBING - INTERMEDIATE | TRINIVJR | Approved | ADDTL COMMS - 1. WASTE AND VENT SYSTEM OK 2. OVERHEAD WATER DISTRIBUTION OK] 3. OK TO DRYWALL 4. CALL FOR GAS PRESSURE TEST |
| 08/12/1999 | PLUMBING - GAS PRESSURE TEST | TVALENCI | Approved | ADDTL COMMS - 1. GAS PRESSURE TEST OK 2. GAS SHUT OFF VALVES OK |