Permit: T99CM01781
Permit Details
Apply Date:
04/15/1999
Applicant:
SONORA EXPEDITING
Description:
SHELL FOR MIXED OCCUPANCY INDUSTRIAL BUILDING
Contractors:
- OLLANIK CONSTRUCTION CO INC ,
Completed Inspections
Permit Status: Final
Permit Number: T99CM01781
Permit Description: SHELL FOR MIXED OCCUPANCY INDUSTRIAL BUILDING
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/05/1999 | PLUMBING - SEWER HCS CONNECT | JSTANLEY | Approved | ADDTL COMMS - TEST ON 4 SITE SEWER TO EXISTING HCS OK TEST ON 4 ABS TRUNCK LINE ONLY INSIDE BLDG OK TO BACK FILL BACK WATER VALVES INSTALLED AT THIS TIME. |
| 08/05/1999 | PLUMBING - ROUGH, SOIL | JSTANLEY | Approved | PARTIAL APPROVAL |
| 08/05/1999 | PLUMBING - ROUGH, SOIL | JSTANLEY | Approved | ADDTL COMMS - TEST ON 4 SITE SEWER TO EXISTING HCS OK. TEST ON 4 ABS TRUNCK LINE ONLY INSIDE BLDG OK TO BACK FILL BACK WATER VALVES INSTALLED AT THIS TIME. |
| 09/22/1999 | ELECTRIC - UNDERGROUND | GDEWITT | Approved | IVRS - Inspection 0000* |
| 10/27/1999 | ELECTRIC - CABLE DROP | GDEWITT | Approved | IVRS - Inspection 0000* |
| 11/01/1999 | STEM WALL/RETAINING WALL | EMONAHAN | Approved | IVRS - Inspection 0000$ |
| 11/01/1999 | STEM WALL/RETAINING WALL | EMONAHAN | Approved | ADDTL COMMS - PARTIAL - AT WING WALLS. |
| 12/29/1999 | PLUMBING - FINAL | JSTANLEY | Approved | NOT READY FOR INSPECTION |
| 12/29/1999 | PLUMBING - FINAL | JSTANLEY | Approved | ADDTL COMMS - PA ON ROOF DRAWS NEED TEST S.W. AND N-E ROOF DRAIN NEEDS TEST ALSO NO VALVE BOX FOR SERVICE NO INSULATION ON WATER PIPE AND PIPE HANGERS AND JUMP PUMP IN NORTH SIDE OF BLD. |