Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Address:
6681 S TUCSON BL
Apply Date:
03/03/1999
Applicant:
HOSACK & ASSOC
Description:
SITE:HOTEL 1ST - 3RD FLOORS
Contractors:
  • PACES LODGING CORPORATION ,

Completed Inspections

Permit Status: C of o
Permit Number: T99CM00917
Permit Description: SITE:HOTEL 1ST - 3RD FLOORS
Total Completed Inspections - 23
Date Description Inspector Results Comments
09/07/1999 PLUMBING - ROUGH, SOIL TVALENCI Approved IVRS - Inspection 0000*
09/09/1999 ELECTRIC - UFER RSUBA Approved IVRS - Inspection 0999*
12/01/1999 ROOF NAILING DWITT Approved ADDTL COMMS - CONFIRM 8D @6 O.C. TO BLOCKING PER 10/S4.2. PROVIDE LETTER FROM ENGINEER OF RECORD RE: USE OF OSB VS PSI PER GEN. STRUC. NOTE, WOOD FRAMING NOTES #19
12/10/1999 PLUMBING - SEWER HCS CONNECT DWITT Approved TOP OUT
12/10/1999 PLUMBING - SEWER HCS CONNECT DWITT Approved ADDTL COMMS - TOP OUT.
12/13/1999 MECHANICAL - INTERMEDIATE CWILLIAM Approved IVRS - Inspection 0000*
12/13/1999 PLUMBING - INTERMEDIATE TVALENCI Approved PARTIAL APPROVAL
12/13/1999 PLUMBING - INTERMEDIATE TVALENCI Approved ADDTL COMMS - OK WASTE AND VENT 1ST 2ND FL GROUP ONE THRU GROUP 8.
12/21/1999 PLUMBING - GAS PRESSURE TEST TVALENCI Approved IVRS - Inspection 0000*
12/21/1999 PLUMBING - GAS PRESSURE TEST TVALENCI Approved ADDTL COMMS - NEED TO SEE MARKING ON ALL GS PIPING GAS PIPING TO DRYER COVER UP NOT A COMPLETE INSPECTION.
12/22/1999 ELECTRIC - INTERMEDIATE JORTA Approved IVRS - Inspection 0000*
12/22/1999 ELECTRIC - INTERMEDIATE JORTA Approved ADDTL COMMS - 1ST FLOOR ROUGH IN APPROVED IN CLUDED PANELS AND 2ND FLOOR ROUGH COMPLETE.
12/28/1999 PLUMBING - ABOVE CEILING TVALENCI Approved IVRS - Inspection 0000*
12/28/1999 SHEET ROCK NAILING DWITT Approved AS NOTED
12/28/1999 FRAMING DWITT Approved AS NOTED
12/30/1999 PLUMBING - YARD WTR LINE/TEST SLONG Approved REJ SILVER BRAZE 3" H2O
12/30/1999 PLUMBING - YARD WTR LINE/TEST SLONG Approved ADDTL COMMS - 3 TYPE K COPPER CHECK W/ARCHITECT FOR POSSIBLE THRUST BLOCKING SUGGEST CLEANING UP BRAZED JOINTS.
02/09/2000 BOILER ROUGH RLOHRMAN Approved
02/25/2000 FIRE - HYDRANTS FIRE Approved
02/25/2000 FIRE SPKLR - UG PIPING FLUSH FIRE Approved
02/25/2000 FIRE SPKLR - UG, PIPING, HYDRO FIRE Approved
02/29/2000 PLUMBING - FINAL TVALENCI Approved IVRS - Inspection 0000*
05/26/2000 PERMIT FINALED DWITT Approved

Documents

File Name Document Type  
None CONSTRPLANS VIEW
None DOCUMENTS VIEW
COFO_04-10-2003.TIF CERT OF OCC VIEW
TEMPORARY COFO_02-11-2000.TIF CERT OF OCC VIEW
TEMPORARY COFO_05-11-2000.TIF CERT OF OCC VIEW
TEMPORARY COFO_02-14-2000.TIF CERT OF OCC VIEW