Permit: T97CM02763
Permit Details
Status:
Final
Type:
SINGLE FAMILY NEW
Address:
7365 E VUELTA RANCHO MESQUITE
Address NEW:
7365 E VUELTA RANCHO MESQUITE
Apply Date:
09/03/1997
Applicant:
CVP VACTOR RANCH LP
Description:
SFR:TD#13-74-74
Contractors:
- CONTRAVEST CONSTRUCTION COMPANY
Completed Inspections
Permit Status: Final
Permit Number: T97CM02763
Permit Description: SFR:TD#13-74-74
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/10/1997 | EXCAVATION/LAYOUT REBAR & ZON | RFREIDIN | Approved | DENIED |
| 09/10/1997 | EXCAVATION/LAYOUT REBAR & ZON | RFREIDIN | Approved | ADDTL COMMS - WEST SIDE NOT PER PLAN SHOULD BE 4.5 FT EAST SIDE APPROVED AT 3.33 OVERHANG WAR NEED TO COMPLY TO 3 ROVE |
| 09/11/1997 | PLUMBING - SEWER HCS CONNECT | RFREIDEN | Approved | DENIED |
| 09/11/1997 | PLUMBING - YARD WTR LINE/TEST | RFREIDEN | Approved | DENIED |
| 09/11/1997 | PLUMBING - ROUGH, SOIL | RFREIDEN | Approved | DENIED |
| 09/22/1997 | ELECTRIC - TEMPORARY SERVICE | ROHAVER | Approved | NOT READY FOR INSPECTION |
| 09/22/1997 | ELECTRIC - CABLE DROP | ROHAVER | Approved | NOT READY FOR INSPECTION |
| 11/10/1997 | SHEET ROCK NAILING | RFREIDIN | Approved | NOT READY FOR INSPECTION |
| 11/10/1997 | SHEET ROCK NAILING | RFREIDIN | Approved | ADDTL COMMS - INTERIOR SHEAR WALLS PERPENDICTULAR TO OUTSIDE WALLS NOT NAILED SEE SECHEDULE. |
| 02/25/1998 | BUILDING - FINAL | RFREIDIN | Approved | ADDTL COMMS - NOT ALL WIRES (FAN BOXES) ADDRESS # SAFTEY GLASS FRONT BEDROOM. |