Permit Details

Status:
Stop Work Order
Type:
Right-of-Way (ROW)
Apply Date:
08/24/2022
Applicant:
ANGEL MORALES
Description:
New water line w/street cut and patch. 4'x10'.** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME

Outstanding Inspections

Permit Status: Stop Work Order
Permit Number: T22RW03038
Permite Description: New water line w/street cut and patch. 4'x10'.** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
07/03/2023 TRSP - ROW - SITE INSPECTION N/A Canceled
07/13/2023 TRSP - ROW - Recurring N/A Re-inspection required (with fee)
11/08/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Complete (Recurring)

Documents

File Name Document Type  
T22RW03038.PDF ROW-RIGHT OF WAY VIEW