Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Details
Status:
Final
Type:
Excavation Only
Apply Date:
08/24/2022
Applicant:
TUCSON ELECTRIC POWER **B
Description:
AFTER-THE-FACT: WO T44953. TEP CREW CHANGED OUT DAMAGED PEDESTAL AS A PRIORITY.
** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING
PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
Emergency – After the fact permit a MCP was not provided due to the nature of the work.
Any legal questions related to this work shall be directed to Tucson Electric Power to address since DTM did not have an opportunity to review, approve or inspect work.
Documents
File Name |
Document Type |
|
T22RW03036.PDF |
ROW-RIGHT OF WAY |
VIEW
|