Permit: T22RW03031
Permit Details
Apply Date:
08/23/2022
Applicant:
Description:
DEVELOPMENT PLAN NUMBER - DP21-0108 SOUTHEAST OF PROPERTY SIDEWALK CLOSURE - 150' TRENCH IN DIRT BEHIND EXISTING SIDEWALK FOR 2" WATER LINE, 4" FIRE LINE, TELEPHONE, IRRAGATION, AND TAP INTO SEWER. DEMO OF EXISTING SIDEWALK & REPLACE SIDEWALK & ADD CURB, AND ADD TO EXISTING DRIVEWAY PAVING. ADA ACCESS. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
Completed Inspections
Permit Status: Complete
Permit Number: T22RW03031
Permit Description: DEVELOPMENT PLAN NUMBER - DP21-0108
SOUTHEAST OF PROPERTY SIDEWALK CLOSURE - 150' TRENCH IN DIRT BEHIND EXISTING SIDEWALK FOR 2" WATER LINE, 4" FIRE LINE, TELEPHONE, IRRAGATION, AND TAP INTO SEWER. DEMO OF EXISTING SIDEWALK & REPLACE SIDEWALK & ADD CURB, AND ADD TO EXISTING DRIVEWAY PAVING. ADA ACCESS.
** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813.
OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP.
BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2022 | TRSP - ROW - Recurring | Passed | ||
| 06/20/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/23/2023 | TRSP - ROW - SITE INSPECTION | Passed | ||
| 07/24/2023 | TRSP - ROW - Final/Close-Out | Passed |