Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Apply Date:
08/20/2022
Applicant:
Description:
LANE CLOSURES FOR CORBETT BLOCK, I-2020-017 - PIA T20PI00018; Work Order: CORBETT BLOCK
PLAN 1 - HARD CLOSURE ON 7TH ST TO INSTALL STORM DRAIN - EXCAVATE APROX. 40’L X 8’D X 5’W.
PLAN 2- REMOVE AND REPLACE 6' OF CURB AT THE SOUTH EST CORNER OF 6TH AV AND 7TH ST. 24 HR CLOSURES.
** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. STOP WORK AND NOTIFY HPO IF ANY BURIED CULTURAL MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION.
1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED.
2. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION.
3. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH.
4. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.)
5. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE.
6. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE.
7. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION
8. MAINTAIN PEDESTRIAN ACCESS
9. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722
Documents
File Name |
Document Type |
|
T22RW03002.PDF |
ROW-RIGHT OF WAY |
VIEW
|