Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Details
Status:
Final
Type:
Barricade Only
Apply Date:
08/15/2022
Applicant:
J E MERIT CONSTRUCTORS INC
Description:
Sample a groundwater monitoring well (1 hour). Work zone is in the Kino Parkway N/B exit ramp.
** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING
PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
Documents
File Name |
Document Type |
|
T22RW02937.PDF |
ROW-RIGHT OF WAY |
VIEW
|