Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
5590 E RIVER RD
Address NEW:
5590 E RIVER RD
Apply Date:
08/13/2022
Applicant:
Description:
Cox to bore 516' to install CATV conduit for system tie. Work Order: PRJ225070-1 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22RW02916
Permite Description: Cox to bore 516' to install CATV conduit for system tie. Work Order: PRJ225070-1 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/14/2022 TRSP - ROW - Recurring N/A Complete (Recurring)
03/10/2023 TRSP - ROW - SITE INSPECTION N/A Complete (Recurring)

Completed Inspections

Permit Status: Complete
Permit Number: T22RW02916
Permit Description: Cox to bore 516' to install CATV conduit for system tie. Work Order: PRJ225070-1 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
Total Completed Inspections - 1
Date Description Inspector Results Comments
04/06/2023 TRSP - ROW - SITE INSPECTION Passed

Documents

File Name Document Type  
T22RW02916.PDF ROW-RIGHT OF WAY VIEW