Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
2929 N CASTRO AV
Address NEW:
2929 N CASTRO AV
Apply Date:
08/09/2022
Applicant:
Description:
N.957869 D - BORING AND/OR TRENCHING 0' TO PLACE NEW CTL CABINET, PLUS OTHER BURIED SECTIONS. ALONG; Work Order: N.957869 D

Conditions

Permit Number - T22RW02850
Permit Status: Complete
Permit Description: N.957869 D - BORING AND/OR TRENCHING 0' TO PLACE NEW CTL CABINET, PLUS OTHER BURIED SECTIONS. ALONG; Work Order: N.957869 D
Date Description Comments
08/09/2022 Proposed line shall be no less than the minimum of 18-ft when crossing signalized street intersection, pavement, or alleys. The height above ground, outside of paved areas and all other intersections shall be no less than 16-ft at lowest sag locations, please refer to section 8.2 in the Tucson Utility Administrative Manual.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22RW02850
Permite Description: N.957869 D - BORING AND/OR TRENCHING 0' TO PLACE NEW CTL CABINET, PLUS OTHER BURIED SECTIONS. ALONG; Work Order: N.957869 D
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/07/2022 TRSP - ROW - Recurring N/A Not Ready No activity

Completed Inspections

Permit Status: Complete
Permit Number: T22RW02850
Permit Description: N.957869 D - BORING AND/OR TRENCHING 0' TO PLACE NEW CTL CABINET, PLUS OTHER BURIED SECTIONS. ALONG; Work Order: N.957869 D
Total Completed Inspections - 1
Date Description Inspector Results Comments
03/05/2024 TRSP - ROW - Final/Close-Out Passed work complete and passes inspection,