Permit Details

Status:
Final
Type:
Barricade and Excavation
Apply Date:
04/19/2022
Applicant:
TUCSON ELECTRIC POWER **B
Description:
WO# 6353062 TEP will be removing 1 pole in the ROW a 2'x2' hole/s 6' deep will be backfilled with/out sidewalk impact. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.

Documents

File Name Document Type  
T22RW01539.PDF ROW-RIGHT OF WAY VIEW