Permit: T22RW00916
Permit Details
Apply Date:
03/11/2022
Applicant:
COX COMMUNICATIONS
Description:
STA 20+65.5' 74'LT 90%%d BEND &2'5' BORE PIT STA 20 +65.5- 44'LT90%%d BEND &2'5' BORE PIT STA 20 = 06' -44LT 45 BEND STA 19 =13'-38' LT INTERCEPT EXISTING CONDUIT AT WOOD POWER POLE ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
Contractors:
- TRUENET COMMUNICATIONS CORP
Outstanding Activity Conditions
Permit Number - T22RW00916
Permit Status: Final
Permit Description: STA 20+65.5' 74'LT 90%%d BEND &2'5' BORE PIT
STA 20 +65.5- 44'LT90%%d BEND &2'5' BORE PIT
STA 20 = 06' -44LT 45 BEND
STA 19 =13'-38' LT INTERCEPT EXISTING CONDUIT AT WOOD POWER POLE
** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
03/14/2022 | Pothole repairs require per COT SD 219Type B |