Permit Details
Status:
Final
Type:
Barricade and Excavation
Apply Date:
03/10/2022
Applicant:
SOUTHWEST GAS
Description:
CREWS WILL BE WORKING ON SWAN ROAD SOUTH BOUND TO ABANDON GAS MAIN - CREW WILL HAVE A BELL HOLE WITH SHORING
** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
ARTERIAL / COLLECTOR