Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Floodplain Use
Address:
4806 E 22ND ST
Apply Date:
06/02/2022
Applicant:
Philip Veneziano
Description:
electrical and plumbing modifications

Conditions

Permit Number - T22OT00412
Permit Status: Issued
Permit Description: electrical and plumbing modifications
Date Description Comments
07/05/2022 Floodplain Use Permit T22OT00421July 5, 2022 (No Elevation Certificate Required). The applicant is authorized to use a portion of the Special Flood Hazard Area (FEMA Zone X, Panel 2284L, Naylor-Swan Park Wash USF) in the City of Tucson at 4806 E 22ND ST for improvements to an existing commercial structure. The applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard regulations, and is particularly bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Land Use Code, or any other Federal, State, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Regulations require the issuance of an additional Floodplain Use Permit.The following conditions shall apply to this permit:1. All work shall conform to the attached plans (T21CM09299) which are made part of this permit.2. The construction cost of the improvements shall not exceed 50 per cent of the total appraised/assessed value of the existing structure, not including the land.The estimated cost of the improvement is $25,317.83 based on permit valuation.The estimated value of the existing structure is $ 2,363,250 based on a submitted appraisal from Leigh B Patalochi.The cost of the improvements is 1.1 percent of the value of the existing structure.The total cost of all improvements to the structure in any 10-year period must not exceed 50 per cent of the value of the structure.3. The existing drainage patterns at the property lines shall not be obstructed or changed.4. Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties.5. This permit becomes invalid and is subject to additional floodplain review, if any required development permit (s') changes the configuration of the structure and or site development.6. Any future development of the sight including patio walls to be constructed will require a separate Floodplain Use Permit.This Floodplain Use Permit will be automatically revoked and becomes invalid if conditions set forth in this permit are not complied with. Floodplain Use Permit T16OT00575May 10, 2016 (No Elevation Certificate Required). The applicant is authorized to use a portion of the Special Flood Hazard Area (FEMA Zone X, Panel 1693L, City of Tucson Flood Hazard Area) in the City of Tucson at 2703 E SEQUOYAH ST, GRANT ROAD PARK W146.46' E246.46' LOT 8 BLK 2, Parcel Number 112-07-059D, for making improvements (solar panels and associated equipment) to an existing residential building.The applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard regulations, and is particularly bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Land Use Code, or any other Federal, State, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Regulations require the issuance of an additional Floodplain Use Permit.The following conditions shall apply to this permit:1. All work shall conform to the attached plans (T16CM02945) which are made part of this permit.2. The construction cost of the improvements shall not exceed 50 per cent of the total appraised/assessed value of the existing structure, not including the land.The estimated cost of the improvement is $6095 based on a Contractor's estimate from SolarCity.The estimated value of the existing structure is $32130.33 which is one third of the value of the triplex structure from the office of the Pima County Assessor.The cost of the improvements is 18.9 per cent of the value of the existing structure.3. The existing drainage patterns at the property lines shall not be obstructed or changed.4. Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties.5. This permit becomes invalid and is subject to additional floodplain review, if any required development permit (s') changes the configuration of the structure and or site development.6. Any future development of the sight including patio walls to be constructed will require a separate Floodplain Use Permit.This Floodplain Use Permit will be automatically revoked and becomes invalid if conditions set forth in this permit are not complied with. Floodplain Use Permit T16OT00398May 10, 2016 (No Elevation Certificate Required). The applicant is authorized to use a portion of the Special Flood Hazard Area (FEMA Zone X, Panel 1693L, City of Tucson Flood Hazard Area) in the City of Tucson at 2709 E SEQUOYAH ST, GRANT ROAD PARK W146.46' E246.46' LOT 8 BLK 2, Parcel Number 112-07-059D, for making improvements (solar panels and associated equipment) to an existing residential building.The applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard regulations, and is particularly bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Land Use Code, or any other Federal, State, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Regulations require the issuance of an additional Floodplain Use Permit.The following conditions shall apply to this permit:1. All work shall conform to the attached plans (T16CM02945) which are made part of this permit.2. The construction cost of the improvements shall not exceed 50 per cent of the total appraised/assessed value of the existing structure, not including the land.The estimated cost of the improvement is $10,041 based on a Contractor's estimate from SolarCity.The estimated value of the existing structure is $62120 which is the full cash value of the structure from the office of the Pima County Assessor.The cost of the improvements is 9.8 per cent of the value of the existing structure.3. The existing drainage patterns at the property lines shall not be obstructed or changed.4. Except as approved by the City Engineer prior to the start of construction, development under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties.5. This permit becomes invalid and is subject to additional floodplain review, if any required development permit (s') changes the configuration of the structure and or site development.6. Any future development of the sight including patio walls to be constructed will require a separate Floodplain Use Permit.This Floodplain Use Permit will be automatically revoked and becomes invalid if conditions set forth in this permit are not complied with.

Documents

File Name Document Type  
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SUPPORTINGDOCUMENTS_AFRICAN STORE ESTIMATE 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SUPPORTINGDOCUMENTS_PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
T22OT00412-ARCHITECTS STUDIO INC.-5_27_2022 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SUPPORTINGDOCUMENTS_AFRICAN STORE ESTIMATE.PDF DOCUMENTS VIEW
SUPPORTINGDOCUMENTS_PLAN SET.PDF DOCUMENTS VIEW
T22OT00412-ARCHITECTS STUDIO INC.-5_27_2022.PDF DOCUMENTS VIEW