Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Floodplain Use
Apply Date:
05/09/2022
Applicant:
Description:
NEW 240V/200A RATING,METER/MAIN COMBO. SERVICEPANEL SINGLE PHASE, WITH100A MAIN BREAKER25 MODU

Permit Reviews

Permit Number - T22OT00336
Permit Status: Issued
Permit Description: NEW 240V/200A RATING,METER/MAIN COMBO. SERVICEPANEL SINGLE PHASE, WITH100A MAIN BREAKER25 MODU
Start Date Submittal Complete Date Status  
05/23/2022 PLANS OK TO SUBMIT - FLOODPLAIN 05/23/2022 COMPLETED Review Details

Conditions

Permit Number - T22OT00336
Permit Status: Issued
Permit Description: NEW 240V/200A RATING,METER/MAIN COMBO. SERVICEPANEL SINGLE PHASE, WITH100A MAIN BREAKER25 MODU
Date Description Comments
05/23/2022 T22OT00336 - ROOFTOP SOLARFLOODPLAIN USE PERMIT FOR T22CM01761THIS PROPERTY IS AFFECTED BY A COT ESTIMATED FLOOD HAZARD ZONETHIS PROJECT IS NOT A SUBSTANTIAL IMPROVEMENTTHE PROJECT VALUATION IS $43,418THE VALUE OF THE STRUCTURE IS ESTIMATED TO BE $123,638THE PROJECT VALUE IS 35.1 PERCENT OF THE VALUE OF THE EXISTING STRUCTURETHE SUM OF ALL IMPROVEMENTS WITHIN ANY TEN YEAR PERIOD IS LIMITED TO 50 PERCENT OF THE VALUE OF THE STRUCTURE OR THE STRUCTURE MUST BE IMPROVED TO FLOODPLAIN STANDARDS.

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLANS; SUPPORTINGDOCUMENTS_COST CONTRACT.PDF DOCUMENTS VIEW
PLANS; SUPPORTINGDOCUMENTS_STAMPED - ANTOINE, SAFARI 03.09.22.PDF DOCUMENTS VIEW