Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
10/20/2022
Applicant:
Kevin Flaherty
Description:
SFR CASITA2X2 T20-M0045

Permit Reviews

Permit Number - T22CM08177
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
Start Date Submittal Complete Date Status  
10/20/2022 OTHER 10/20/2022 ACTIVE Review Details
01/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/16/2024 APPROVED Review Details
11/30/2022 RESIDENTIAL NEW DWELLING v.2 12/07/2022 APPROVED Review Details
10/31/2022 RESIDENTIAL NEW DWELLING v.1 11/28/2022 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - T22CM08177
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
Date Description Comments
10/20/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
10/20/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
10/20/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM08177
Permite Description: SFR CASITA2X2 T20-M0045
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/21/2023 ENGR Engineering Final N/A Not Ready Complete this site as discussed during this field visit with Rob Brach, it will be rescheduled for Dec. 26, 2023.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM08177
Permit Description: SFR CASITA2X2 T20-M0045
Total Completed Inspections - 16
Date Description Inspector Results Comments
02/23/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
03/02/2023 COT - RSBU - Preslab Passed
03/02/2023 COT - RSEL - Electrical Underground Passed
07/24/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
07/24/2023 COT - RSBU - Roof Nailing Passed
10/12/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Aug 16, 2023: Intermediate inspection passed, was not scheduled on the portal.
10/12/2023 COT - RSPL - Yard Water Line Passed
10/12/2023 COT - RSEL - Temporary Service Passed 9125 E Catalina Hy, Build 127 TEP ECO
11/30/23 clearance resent
10/12/2023 COT - RSPL - Sewer Passed
10/12/2023 COT - RSPL - Rough Soil Passed
12/18/2023 COT - RSEL - Outdoor Lighting Passed
12/18/2023 COT - RSEL - Electrical Final Passed
12/18/2023 COT - RSME - Mechanical Final Passed
12/18/2023 RSBU - Building Final Passed
12/18/2023 COT - RSPL - Plumbing Final Passed
01/08/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
2X2 TRUSS CALCS_V1.PDF DOCUMENTS VIEW
2X2 TRUSS LAYOUT_V1.PDF DOCUMENTS VIEW
SIC PT BLDG. 127 COMPLETE-2024-01-11_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW