Permit: T22CM08155
Permit Details
Apply Date:
10/20/2022
Applicant:
Description:
Conversion of SFR to Assisted Living
Permit Reviews
Permit Number - T22CM08155
Permit Status: Issued
Permit Description: Conversion of SFR to Assisted Living
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/20/2022 | COMMERCIAL - TI | 10/20/2022 | ACTIVE |
| 10/31/2022 | COMMERCIAL REVIEW - FULL v.1 | 02/01/2023 | REQUIRES RESUBMIT |
| 03/13/2023 | COMMERCIAL REVIEW - FULL v.3 | 03/28/2023 | APPROVED |
| 02/02/2023 | COMMERCIAL REVIEW - FULL v.2 | 02/15/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - T22CM08155
Permit Status: Issued
Permit Description: Conversion of SFR to Assisted Living
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 06/20/2024 | AIR BALANCING REPORT IS REQUIRED. |
| 06/20/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - T22CM08155
Permit Status: Issued
Permit Description: Conversion of SFR to Assisted Living
| Date | Description | Comments |
|---|---|---|
| 03/30/2023 | Contractor's active Arizona Contractor's License number for specified scope of work required prior to issuance of permit. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM08155
Permite Description: Conversion of SFR to Assisted Living
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/10/2023 | COT - HCPL - Sewer | N/A | Re-inspection required | 4-10-23: Need tracer wire. |
| 04/10/2023 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 4-10-23: Rear patio and Addition only. |
| 04/10/2023 | COT - HCBU - Preslab | N/A | Partial Pass | 4-10-23: Rear patio and Addition only. |
| 07/20/2023 | COT - HCPL - Plumbing Above Ceiling | N/A | Canceled | |
| 07/20/2023 | COT - HCEL - Electrical Above Ceiling | N/A | Re-inspection required | 7/20/23: ground all metal boxes. |
| COT - FCON - Fire - Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM08155
Permit Description: Conversion of SFR to Assisted Living
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/10/2023 | COT - HCPL - Rough Soil | Passed | ||
| 07/06/2023 | COT - HCBU - Roof Nailing | Passed | ||
| 07/06/2023 | COT - HCBU - Framing | Passed | ||
| 07/20/2023 | COT - HCPL - Plumbing Roof Drains | Passed | 7/20/23: 3 sets of roof drains on west wall approved. | |
| 07/28/2023 | COT - LCEL - Electrical Intermediate | Passed | ||
| 07/28/2023 | COT - HCEL - Electrical Intermediate | Passed | ||
| 07/28/2023 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 11/14/2023 | BULD - Electrical Clearance | Passed | Approved 200A load center/ disconnect to existing 600A SES, INCR Clearance is required for the cutover | |
| 11/14/2023 | COT - HCEL - Electrical Underground | Passed | ||
| 12/08/2023 | COT - HCPL - Plumbing Final | Passed | ||
| 12/08/2023 | COT - FCON - Sprinkler - Final | Passed | Approved on 11/4/23 on permit TF-FCP-1122-00169 | |
| 12/18/2023 | COT - FCON - Alarm - Final | Passed | ||
| 12/18/2023 | COT - FCON - Fire - Final | Passed | ||
| 12/19/2023 | COT - HCME - Mechanical Final | Passed | ||
| 12/19/2023 | COT - HCBU - Building Final | Passed | ||
| 12/19/2023 | COT - HCEL - Electrical Final | Passed |