Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM08140
Permit Details
Status:
In Review
Type:
Residential Building - One or Two Family
Address:
175 W CALLE FRANCITA
Address NEW:
175 W CALLE FRANCITA
Apply Date:
10/20/2022
Applicant:
Description:
R - • SYSTEM SIZE: 4260W DC, 2880W AC• MODULES: (12) LONGI GREEN ENERGY TECHNOLOGY COLTD: LR4-60HP
Permit Reviews
Permit Number - T22CM08140
Permit Status: In review
Permit Description: R - • SYSTEM SIZE: 4260W DC, 2880W AC• MODULES: (12) LONGI GREEN ENERGY TECHNOLOGY COLTD: LR4-60HP
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/20/2022 | OTHER | 10/20/2022 | ACTIVE |
| 10/31/2022 | RESIDENTIAL SOLAR v.1 | 11/22/2022 | APPROVED |
Conditions
Permit Number - T22CM08140
Permit Status: In review
Permit Description: R - • SYSTEM SIZE: 4260W DC, 2880W AC• MODULES: (12) LONGI GREEN ENERGY TECHNOLOGY COLTD: LR4-60HP
| Date | Description | Comments |
|---|---|---|
| 10/20/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: In Review
Permit Number: T22CM08140
Permite Description: R - • SYSTEM SIZE: 4260W DC, 2880W AC• MODULES: (12) LONGI GREEN ENERGY TECHNOLOGY COLTD: LR4-60HP
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2023 | RSEL - Electrical Progress | N/A | Re-inspection required | main panel requires a disconnect |
Completed Inspections
Permit Status: In Review
Permit Number: T22CM08140
Permit Description: R - • SYSTEM SIZE: 4260W DC, 2880W AC• MODULES: (12) LONGI GREEN ENERGY TECHNOLOGY COLTD: LR4-60HP
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/08/2023 | BULD - Electrical Clearance | Passed | Approved, DGL/DGC clearance to TEP is required | |
| 02/08/2023 | COT - RSEL - Electrical Final | Passed | ||
| 02/08/2023 | RSBU - Building Final | Passed |