Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM08105
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
9125 E CATALINA HY BLDG 74
Address NEW:
9125 E CATALINA HY BLDG 74
Apply Date:
10/19/2022
Applicant:
Kevin Flaherty
Description:
SFR CASITA3X2 T20-M0046
Permit Reviews
Permit Number - T22CM08105
Permit Status: Complete
Permit Description: SFR CASITA3X2 T20-M0046
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/19/2022 | OTHER | 10/19/2022 | ACTIVE |
| 11/30/2022 | RESIDENTIAL NEW DWELLING v.2 | 12/01/2022 | APPROVED |
| 10/29/2022 | RESIDENTIAL NEW DWELLING v.1 | 11/22/2022 | REQUIRES RESUBMIT |
| 01/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/12/2024 | APPROVED |
Conditions
Permit Number - T22CM08105
Permit Status: Complete
Permit Description: SFR CASITA3X2 T20-M0046
| Date | Description | Comments |
|---|---|---|
| 10/19/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 10/19/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 10/19/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM08105
Permite Description: SFR CASITA3X2 T20-M0046
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2023 | COT - RSPL - Rough Soil | N/A | Canceled | canceled due to rain |
| 02/13/2023 | COT - RSPL - Sewer | N/A | Canceled | cancel due to rain |
| 12/21/2023 | ENGR Engineering Final | N/A | Not Ready | Complete this site as discussed during this field visit with Rob Brach, it will be rescheduled for Dec. 26, 2023. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM08105
Permit Description: SFR CASITA3X2 T20-M0046
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2023 | COT - RSPL - Rough Soil | Passed | ||
| 02/14/2023 | COT - RSPL - Sewer | Passed | ||
| 02/23/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 03/01/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 03/01/2023 | COT - RSBU - Preslab | Passed | ||
| 06/08/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 07/17/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 07/17/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 08/14/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/21/2023 | COT - RSME - Mechanical Final | Passed | ||
| 10/11/2023 | COT - RSEL - Temporary Service | Passed | 9125 E Catalina Hy Bldg 74, TEP ECO | |
| 12/13/2023 | RSBU - Building Final | Passed | 12/13/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, kitchen, bathroom, and exterior outlets are GFCI protected. Okay to issue Certificate of Occupancy after all other permit final inspections are completed. | |
| 12/13/2023 | COT - RSEL - Outdoor Lighting | Passed | 12/13/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, kitchen, bathroom, and exterior outlets are GFCI protected. Okay to issue Certificate of Occupancy after all other permit final inspections are completed. | |
| 12/13/2023 | COT - RSPL - Plumbing Final | Passed | 12/13/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, kitchen, bathroom, and exterior outlets are GFCI protected. Okay to issue Certificate of Occupancy after all other permit final inspections are completed. | |
| 12/13/2023 | COT - RSEL - Electrical Final | Passed | 12/13/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, kitchen, bathroom, and exterior outlets are GFCI protected. Okay to issue Certificate of Occupancy after all other permit final inspections are completed. | |
| 01/08/2024 | ENGR Engineering Final | Passed |