Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM08104
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
9125 E CATALINA HY BLDG73
Address NEW:
9125 E CATALINA HY BLDG73
Apply Date:
10/19/2022
Applicant:
Kevin Flaherty
Description:
SFR CASITA2X2 T20-M0045
Permit Reviews
Permit Number - T22CM08104
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/19/2022 | OTHER | 10/19/2022 | ACTIVE |
| 11/30/2022 | RESIDENTIAL NEW DWELLING v.2 | 12/01/2022 | APPROVED |
| 10/29/2022 | RESIDENTIAL NEW DWELLING v.1 | 11/14/2022 | REQUIRES RESUBMIT |
| 01/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/12/2024 | APPROVED |
Conditions
Permit Number - T22CM08104
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
| Date | Description | Comments |
|---|---|---|
| 10/19/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 10/19/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
| 10/19/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM08104
Permite Description: SFR CASITA2X2 T20-M0045
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2023 | COT - RSPL - Rough Soil | N/A | Canceled | canceled due to rain |
| 02/13/2023 | COT - RSPL - Sewer | N/A | Canceled | cancel due to rain |
| 08/23/2023 | COT - RSME - Mechanical Final | N/A | Not Ready | Wanted drywall inspection. |
| 12/21/2023 | ENGR Engineering Final | N/A | Not Ready | Complete this site as discussed during this field visit with Rob Brach, it will be rescheduled for Dec. 26, 2023. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM08104
Permit Description: SFR CASITA2X2 T20-M0045
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2023 | COT - RSPL - Rough Soil | Passed | ||
| 02/14/2023 | COT - RSPL - Sewer | Passed | ||
| 02/23/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 03/01/2023 | COT - RSBU - Preslab | Passed | ||
| 03/01/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 06/08/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 07/19/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 07/19/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 08/14/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/23/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 10/11/2023 | COT - RSEL - Temporary Service | Passed | 9125 E Catalina Hy Bldg 73, TEP ECO | |
| 12/13/2023 | COT - RSME - Mechanical Final | Passed | 12/13/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, kitchen, bathroom, and exterior outlets are GFCI protected. Okay to issue Certificate of Occupancy after all other permit final inspections are completed. | |
| 12/13/2023 | RSBU - Building Final | Passed | 12/13/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, kitchen, bathroom, and exterior outlets are GFCI protected. Okay to issue Certificate of Occupancy after all other permit final inspections are completed. | |
| 12/13/2023 | COT - RSEL - Outdoor Lighting | Passed | 12/13/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, kitchen, bathroom, and exterior outlets are GFCI protected. Okay to issue Certificate of Occupancy after all other permit final inspections are completed. | |
| 12/13/2023 | COT - RSPL - Plumbing Final | Passed | 12/13/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, kitchen, bathroom, and exterior outlets are GFCI protected. Okay to issue Certificate of Occupancy after all other permit final inspections are completed. | |
| 12/13/2023 | COT - RSEL - Electrical Final | Passed | 12/13/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled, kitchen, bathroom, and exterior outlets are GFCI protected. Okay to issue Certificate of Occupancy after all other permit final inspections are completed. | |
| 01/08/2024 | ENGR Engineering Final | Passed |