Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
10/19/2022
Applicant:
Kevin Flaherty
Description:
SFR CASITA2X2 T20-M0045

Permit Reviews

Permit Number - T22CM08101
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
Start Date Submittal Complete Date Status  
10/19/2022 OTHER 10/19/2022 ACTIVE Review Details
10/29/2022 RESIDENTIAL NEW DWELLING v.1 11/14/2022 REQUIRES RESUBMIT Review Details
11/30/2022 RESIDENTIAL NEW DWELLING v.2 12/01/2022 APPROVED Review Details
01/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/12/2024 APPROVED Review Details

Conditions

Permit Number - T22CM08101
Permit Status: Complete
Permit Description: SFR CASITA2X2 T20-M0045
Date Description Comments
10/19/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
10/19/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
10/19/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM08101
Permite Description: SFR CASITA2X2 T20-M0045
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
09/12/2023 COT - RSEL - Temporary Service N/A Not Applicable 9/12/23: not applicable
02/21/2023 COT - BULD - SWG Clearance N/A Canceled Wanted pre-slab.
12/21/2023 ENGR Engineering Final N/A Not Ready Complete this site as discussed during this field visit with Rob Brach, it will be rescheduled for Dec. 26, 2023.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM08101
Permit Description: SFR CASITA2X2 T20-M0045
Total Completed Inspections - 16
Date Description Inspector Results Comments
02/09/2023 COT - RSPL - Sewer Passed
02/09/2023 COT - RSPL - Rough Soil Passed
02/28/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
02/28/2023 COT - RSBU - Preslab Passed
06/08/2023 COT - RSPL - Yard Water Line Passed
08/08/2023 COT - RSBU - Roof Nailing Passed
08/08/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
08/30/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/12/2023 COT - RSBU - Interior Shear Bracing Passed
10/13/2023 BULD - Electrical Clearance Passed 9125 E Catalina Hy, Build 70 TEP ECO
11/22/23 Clearance resent
12/18/2023 COT - RSME - Mechanical Final Passed
12/18/2023 RSBU - Building Final Passed
12/18/2023 COT - RSEL - Outdoor Lighting Passed
12/18/2023 COT - RSPL - Plumbing Final Passed
12/18/2023 COT - RSEL - Electrical Final Passed
01/08/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
2X2 TRUSS CALCS_V1.PDF DOCUMENTS VIEW
2X2 TRUSS LAYOUT_V1.PDF DOCUMENTS VIEW
PT UNIT 70 COMPLETE-2024-01-11_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW