Permit: T22CM08026
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
6851 E CAMINO NAIFE
Address NEW:
6851 E CAMINO NAIFE
Apply Date:
10/18/2022
Applicant:
Gloria Salmeron
Description:
SFR LE23002 T22-M0057
Outstanding Activity Conditions
Permit Number - T22CM08026
Permit Status: Issued
Permit Description: SFR LE23002 T22-M0057
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 07/13/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
| 07/13/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 10/18/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
| 10/18/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 10/18/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-098/P22WP00026 - THE PUBLIC OFFSITE SEWER G-2020-058/P21WP00065 FOR PARCEL 3, THE PUBLICOFFSITE SEWER G-20--101/P21WP00064 FOR PARCEL 4, AND THE PUBLIC SEWER G-2020-090/P21WP00062 FOR PARCEL 5, IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM08026
Permite Description: SFR LE23002 T22-M0057
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM08026
Permit Description: SFR LE23002 T22-M0057
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2022 | COT - RSPL - Rough Soil | Passed | okay to backfill. shading required | |
| 12/23/2022 | COT - RSPL - Yard Water Line | Passed | ||
| 01/05/2023 | COT - RSBU - Preslab | Passed | ||
| 01/05/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 01/05/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 01/05/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 01/25/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 01/25/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 03/24/2023 | COT - RSEL - Construction Power | Passed | Pass | |
| 04/24/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
| 04/26/2023 | RSME - Mechanical Progress | Passed | all mechanical duct is installed | |
| 04/26/2023 | COT - LCBU - Framing | Passed | 4-26-23: Pex lines are under air pressure testing and holding. Vent stack has been moved to other side of ridge away from fresh air vent. Anchor bolts have been installed under window of master bedroom. | |
| 04/26/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4-26-23: Pex lines are under air pressure testing and holding. Vent stack has been moved to other side of ridge away from fresh air vent. Anchor bolts have been installed under window of master bedroom. | |
| 04/26/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 05/03/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 08/04/2023 | COT - BULD - SWG Clearance | Passed | Swg clearance for meter only. | |
| 08/18/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 08/18/2023 | RSBU - Building Final | Passed | ||
| 08/18/2023 | COT - RSEL - Electrical Final | Passed | ||
| 08/18/2023 | COT - RSPL - Sewer | Passed | ||
| 08/18/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/18/2023 | COT - RSME - Mechanical Final | Passed | ||
| 08/23/2023 | ENGR Engineering Final | Passed |