Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
10/18/2022
Applicant:
Audie Batsford
Description:
TI: Studio

Permit Reviews

Permit Number - T22CM08005
Permit Status: Issued
Permit Description: TI: Studio
Start Date Submittal Complete Date Status  
10/18/2022 COMMERCIAL - TI 10/19/2022 ACTIVE Review Details
10/28/2022 COMMERCIAL REVIEW - FULL v.1 12/01/2022 REQUIRES RESUBMIT Review Details
12/19/2022 COMMERCIAL REVIEW - FULL v.2 02/08/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T22CM08005
Permit Status: Issued
Permit Description: TI: Studio
Total Outstanding Activity Conditions - 2
Date Name
11/29/2022 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
11/29/2022 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - T22CM08005
Permit Status: Issued
Permit Description: TI: Studio
Date Description Comments
02/08/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM08005
Permite Description: TI: Studio
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
COT - FCON - Alarm - Final N/A Not Ready
COT - FCON - Sprinkler - Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM08005
Permit Description: TI: Studio
Total Completed Inspections - 14
Date Description Inspector Results Comments
02/24/2023 COT - HCBU - Framing Passed Framing for separation wall and bathroom walls are complete
02/24/2023 COT - HCPL - Plumbing Intermediate Passed plumbing rough in for restroom is complete.
02/24/2023 COT - HCPL - Plumbing Above Ceiling Passed vent stack is properly plumbed to outside of building.
02/24/2023 COT - HCPL - Rough Soil Passed
03/23/2023 COT - HCBU - Building Above Ceiling Passed
03/23/2023 COT - HCEL - Electrical Above Ceiling Passed
03/28/2023 BULD - Electrical Clearance Passed Electric clearance: ECO
04/21/2023 COT - HCME - Mechanical Final Passed
04/21/2023 COT - HCBU - Building Final Passed Pending Fire final.
04/21/2023 COT - HCEL - Electrical Final Passed
04/21/2023 COT - HCPL - Plumbing Final Passed
04/21/2023 COT - HCME - Mechanical Intermediate Passed
05/05/2023 COT - FCON - Sprinkler - Final Passed Approved on 5/2/23 on permit TF-FCP-0423-00622.
05/05/2023 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2_PLAN SET_V2.PDF DOCUMENTS VIEW
2_STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_MECH COMCHECK_V1.PDF DOCUMENTS VIEW
1_MECH SYSTEMS DESIGN REPORT_V1.PDF DOCUMENTS VIEW