Permit: T22CM07950
Permit Details
Apply Date:
10/17/2022
Applicant:
Description:
THE RENOVATION OF A PORTION OF THE FIRST LEVEL OF THE BUILDING INTO TENANT USE SPACES, SUCH AS A STUDY AREA, A NEW LOBBY, AND A FITNESS ROOM. - demo under separate permit
Permit Reviews
Permit Number - T22CM07950
Permit Status: Issued
Permit Description: THE RENOVATION OF A PORTION OF THE FIRST LEVEL OF THE BUILDING INTO TENANT USE SPACES, SUCH AS A STUDY AREA, A NEW LOBBY, AND A FITNESS ROOM. - demo under separate permit
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/17/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 10/17/2022 | ACTIVE |
10/28/2022 | COMMERCIAL REVIEW - FULL v.1 | 11/29/2022 | REQUIRES RESUBMIT |
08/14/2023 | COMMERCIAL REVIEW - FULL v.2 | 08/22/2023 | REQUIRES RESUBMIT |
07/12/2024 | COMMERCIAL REVIEW - FULL v.1 | 07/17/2024 | APPROVED |
06/15/2023 | RESTAMP - COMMERCIAL v.1 | 06/20/2023 | APPROVED |
06/12/2023 | COMMERCIAL REVIEW - FULL v.4 | 06/12/2023 | REQUIRES RESUBMIT |
08/23/2023 | COMMERCIAL REVIEW - FULL v.3 | 08/25/2023 | APPROVED |
04/20/2023 | COMMERCIAL REVIEW - FULL v.2 | 05/10/2023 | REQUIRES RESUBMIT |
08/25/2023 | RESTAMP - COMMERCIAL v.1 | 08/29/2023 | APPROVED |
06/13/2023 | COMMERCIAL REVIEW - FULL v.5 | 06/15/2023 | APPROVED |
05/24/2023 | COMMERCIAL REVIEW - FULL v.3 | 06/12/2023 | REQUIRES RESUBMIT |
08/11/2023 | COMMERCIAL REVIEW - FULL v.1 | 08/11/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - T22CM07950
Permit Status: Issued
Permit Description: THE RENOVATION OF A PORTION OF THE FIRST LEVEL OF THE BUILDING INTO TENANT USE SPACES, SUCH AS A STUDY AREA, A NEW LOBBY, AND A FITNESS ROOM. - demo under separate permit
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
08/05/2024 | AIR BALANCING REPORT IS REQUIRED. |
08/05/2024 | COMMISSIONING REPORT IS REQUIRED. |
08/05/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - T22CM07950
Permit Status: Issued
Permit Description: THE RENOVATION OF A PORTION OF THE FIRST LEVEL OF THE BUILDING INTO TENANT USE SPACES, SUCH AS A STUDY AREA, A NEW LOBBY, AND A FITNESS ROOM. - demo under separate permit
Date | Description | Comments |
---|---|---|
10/17/2022 | GENERAL CONTRACTOR LETTER (GCL) REQUIRED PRIOR TO ISSUANCE |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM07950
Permite Description: THE RENOVATION OF A PORTION OF THE FIRST LEVEL OF THE BUILDING INTO TENANT USE SPACES, SUCH AS A STUDY AREA, A NEW LOBBY, AND A FITNESS ROOM. - demo under separate permit
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/19/2023 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | Plumbing underground: Ok to set dowels and cover and compact progress areas. |
02/07/2024 | BULD - Electrical Clearance | N/A | Not Ready | Contractor cancelled. |
02/07/2024 | COT - HCEL - Electrical Progress | N/A | Partial Pass | In wall electric and panel up grade in electric room. OK to cover progress areas. |
11/01/2023 | COT - HCBU - Preslab | N/A | Partial Pass | 10/26/23: Entrance ramp reinforcement 16"x16" with dowels at every 16", ramp is being replaced to comply with ada requirements. Architect will submit letter for ramp. 11/1/23: dowels with epoxy per plan at existing slab to new slab ok to proceed. |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM07950
Permit Description: THE RENOVATION OF A PORTION OF THE FIRST LEVEL OF THE BUILDING INTO TENANT USE SPACES, SUCH AS A STUDY AREA, A NEW LOBBY, AND A FITNESS ROOM. - demo under separate permit
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/24/2024 | COT - HCPL - Rough Soil | Passed | ||
08/07/2024 | COT - HCPL - Plumbing Final | Passed | No bacteria test required. Test completed as part of attached student,housing. | |
08/07/2024 | COT - HCEL - Electrical Final | Passed | ||
08/07/2024 | COT - HCBU - Preslab | Passed |