Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM07938
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
9000 S SILKWOOD LN
Address NEW:
9000 S SILKWOOD LN
Apply Date:
10/17/2022
Applicant:
Description:
R - Installation of 16.65KW PV System with battery 10.5KW/Derate to 150A
Permit Reviews
Permit Number - T22CM07938
Permit Status: Issued
Permit Description: R - Installation of 16.65KW PV System with battery 10.5KW/Derate to 150A
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/17/2022 | OTHER | 10/20/2022 | COMPLETED |
| 12/20/2022 | RESIDENTIAL SOLAR v.1 | 12/20/2022 | APPROVED |
| 12/21/2022 | RESIDENTIAL SOLAR v.1 | 01/20/2023 | APPROVED |
Conditions
Permit Number - T22CM07938
Permit Status: Issued
Permit Description: R - Installation of 16.65KW PV System with battery 10.5KW/Derate to 150A
| Date | Description | Comments |
|---|---|---|
| 10/19/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 10/17/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM07938
Permite Description: R - Installation of 16.65KW PV System with battery 10.5KW/Derate to 150A
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/18/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM07938
Permit Description: R - Installation of 16.65KW PV System with battery 10.5KW/Derate to 150A
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/18/2023 | RSBU - Building Final | Passed | ||
| 05/18/2023 | BULD - Electrical Clearance | Passed | ||
| 05/18/2023 | RSEL - Electrical Progress | Passed | ||
| 05/18/2023 | COT - RSEL - Electrical Final | Passed |