Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM07931
Permit Details
Apply Date:
10/15/2022
Applicant:
Anthony Dao
Description:
TI: Paracelsus Consulting
Permit Reviews
Permit Number - T22CM07931
Permit Status: Complete
Permit Description: TI: Paracelsus Consulting
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/15/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 10/17/2022 | ACTIVE |
05/24/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/26/2023 | REQUIRES RESUBMIT |
02/16/2023 | COMMERCIAL REVIEW - FULL v.3 | 03/01/2023 | APPROVED |
06/05/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/05/2023 | REQUIRES RESUBMIT |
12/19/2022 | COMMERCIAL REVIEW - FULL v.2 | 01/18/2023 | REQUIRES RESUBMIT |
10/28/2022 | COMMERCIAL REVIEW - FULL v.1 | 11/28/2022 | REQUIRES RESUBMIT |
06/01/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | N/A | IN REVIEW |
06/05/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | N/A | IN REVIEW |
Conditions
Permit Number - T22CM07931
Permit Status: Complete
Permit Description: TI: Paracelsus Consulting
Date | Description | Comments |
---|---|---|
01/05/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
03/01/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
01/05/2023 | Signage Designs must be submitted and approved prior to ... | |
01/05/2023 | WATER STERILIZATION REPORT IS REQUIRED. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM07931
Permit Description: TI: Paracelsus Consulting
Total Completed Inspections - 16
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/14/2023 | COT - HCPL - Plumbing Progress | Passed | 4-14-23: plumbing rough in complete. Okay to sheet rock restrooms. | |
04/14/2023 | COT - HCBU - Building Progress | Passed | All interior walls are sheet rock one side. Okay to sheet rock other side. | |
04/14/2023 | COT - HCBU - Framing | Passed | All interior walls are sheet rock one side. Okay to sheet rock other side. | |
04/18/2023 | COT - HCEL - Electrical Progress | Passed | ||
04/28/2023 | COT - HCBU - Building Above Ceiling | Passed | Electrical, plumbing, and mechanical rough-in is complete above ceiling. Okay to install ceiling tiles into grid. | |
04/28/2023 | COT - HCEL - Electrical Intermediate | Passed | Electrical rough-in is complete. | |
04/28/2023 | COT - HCBU - Interior Shear Bracing | Passed | Interior walls are complete and ready for paint. | |
05/05/2023 | COT - HCEL - Electrical Above Ceiling | Passed | Electrical above ceiling is complete. Lights are functional throughout building. All junction boxes are properly marked. | |
05/05/2023 | COT - HCME - Mechanical Above Ceiling | Passed | Mechanical rough-in is complete, registers are installed in drop ceiling. | |
05/05/2023 | COT - HCME - Mechanical Intermediate | Passed | Mechanical rough-in is complete, registers are installed in drop ceiling. | |
05/19/2023 | COT - HCEL - Electrical Final | Passed | ||
05/19/2023 | COT - HCBU - Building Final | Passed | ||
05/19/2023 | COT - HCME - Mechanical Final | Passed | ||
05/19/2023 | COT - HCME - Mechanical Progress | Passed | ||
05/19/2023 | COT - HCPL - Plumbing Final | Passed | ||
05/19/2023 | COT - HCPL - Plumbing Intermediate | Passed |