Permit: T22CM07930
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3116 E 27TH ST
Address NEW:
3116 E 27TH ST
Apply Date:
10/15/2022
Applicant:
Description:
SFR
Permit Reviews
Permit Number - T22CM07930
Permit Status: Complete
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/15/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 10/17/2022 | ACTIVE |
| 01/04/2023 | RESIDENTIAL NEW DWELLING v.1 | 02/17/2023 | APPROVED |
| 10/29/2022 | RESIDENTIAL NEW DWELLING v.1 | 11/01/2022 | REQUIRES RESUBMIT |
| 12/01/2022 | RESIDENTIAL NEW DWELLING v.2 | 12/02/2022 | REQUIRES RESUBMIT |
Conditions
Permit Number - T22CM07930
Permit Status: Complete
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 02/17/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
| 02/17/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM07930
Permit Description: SFR
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/15/2023 | COT - RSPL - Rough Soil | Passed | ||
| 06/22/2023 | COT - RSBU - Preslab | Passed | ||
| 06/22/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar per plan. Okay for concrete placement. 6/22/2023 | |
| 06/22/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/07/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 08/07/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 09/27/2023 | COT - RSBU - Interior Shear Bracing | Passed | All interior shear walls are properly installed and screwed off. Okay to tape and texture interior walls. | |
| 10/25/2023 | COT - RSEL - Temporary Service | Passed | Approved service panel, ECO Clearance to TEP is required for construction power | |
| 10/25/2023 | BULD - Electrical Clearance | Passed | Approved service panel, ECO Clearance to TEP is required for construction power | |
| 11/08/2023 | COT - RSPL - Sewer | Passed | 11/8/23: Sewer connection is complete, contractor dug up connection for inspection. Okay to shade pipe and backfill hole. | |
| 11/08/2023 | COT - RSPL - Yard Water Line | Passed | Main water line is connected to City of Tucson main water supply line and fully operational. | |
| 01/17/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 01/17/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 02/01/2024 | COT - RSEL - Electrical Final | Passed | ||
| 02/01/2024 | COT - RSME - Mechanical Final | Passed | ||
| 02/01/2024 | RSBU - Building Final | Passed | ||
| 02/02/2024 | ENGR Engineering Final | Passed |