Permit: T22CM07826
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4425 E 28TH ST
Address NEW:
4425 E 28TH ST
Apply Date:
10/13/2022
Applicant:
Description:
R - Installing a new 7.80kW residential rooftop solar system.
Permit Reviews
Permit Number - T22CM07826
Permit Status: Complete
Permit Description: R - Installing a new 7.80kW residential rooftop solar system.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/13/2022 | OTHER | 10/18/2022 | COMPLETED |
| 11/21/2024 | RESIDENTIAL SOLAR v.1 | 12/06/2024 | REQUIRES RESUBMIT |
| 01/19/2023 | RESIDENTIAL SOLAR v.1 | 01/19/2023 | APPROVED |
| 12/20/2022 | RESIDENTIAL SOLAR v.1 | 01/19/2023 | APPROVED |
| 12/12/2024 | RESIDENTIAL SOLAR v.2 | 01/02/2025 | APPROVED |
Conditions
Permit Number - T22CM07826
Permit Status: Complete
Permit Description: R - Installing a new 7.80kW residential rooftop solar system.
| Date | Description | Comments |
|---|---|---|
| 10/17/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 10/13/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM07826
Permite Description: R - Installing a new 7.80kW residential rooftop solar system.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2025 | BULD - Electrical Clearance | N/A | Not Applicable | 1-28-25, not applicable-existing power on residence. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM07826
Permit Description: R - Installing a new 7.80kW residential rooftop solar system.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2025 | RSBU - Building Final | Passed | 1-28-25, solar panel installation verified as per plans. DGC clearance issued to TEP. | |
| 01/28/2025 | COT - RSEL - Electrical Final | Passed | 1-28-25, electrical final approved. DGC clearance sent to TEP for solar meter. |