Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
4425 E 28TH ST
Address NEW:
4425 E 28TH ST
Apply Date:
10/13/2022
Applicant:
Description:
R - Installing a new 7.80kW residential rooftop solar system.

Permit Reviews

Permit Number - T22CM07826
Permit Status: Complete
Permit Description: R - Installing a new 7.80kW residential rooftop solar system.
Start Date Submittal Complete Date Status  
10/13/2022 OTHER 10/18/2022 COMPLETED Review Details
11/21/2024 RESIDENTIAL SOLAR v.1 12/06/2024 REQUIRES RESUBMIT Review Details
01/19/2023 RESIDENTIAL SOLAR v.1 01/19/2023 APPROVED Review Details
12/20/2022 RESIDENTIAL SOLAR v.1 01/19/2023 APPROVED Review Details
12/12/2024 RESIDENTIAL SOLAR v.2 01/02/2025 APPROVED Review Details

Conditions

Permit Number - T22CM07826
Permit Status: Complete
Permit Description: R - Installing a new 7.80kW residential rooftop solar system.
Date Description Comments
10/17/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
10/13/2022 THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM07826
Permite Description: R - Installing a new 7.80kW residential rooftop solar system.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/28/2025 BULD - Electrical Clearance N/A Not Applicable 1-28-25, not applicable-existing power on residence.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM07826
Permit Description: R - Installing a new 7.80kW residential rooftop solar system.
Total Completed Inspections - 2
Date Description Inspector Results Comments
01/28/2025 RSBU - Building Final Passed 1-28-25, solar panel installation verified as per plans. DGC clearance issued to TEP.
01/28/2025 COT - RSEL - Electrical Final Passed 1-28-25, electrical final approved. DGC clearance sent to TEP for solar meter.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SUN1369 RESPONSE LETTER_V2.PDF DOCUMENTS VIEW
SUN1369-ELLEN-MCBRIDE12.11.24ENGINEERING_V2.PDF DOCUMENTS VIEW
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
CONTRACT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
ONLINE APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLANS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CONTRACT.PDF DOCUMENTS VIEW
ONLINE APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLANS.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
MCBRIDE ENGINEERING 12-05-22_V1.PDF DOCUMENTS VIEW
T22CM07826 REVISION LETTER (3)_V1.PDF DOCUMENTS VIEW