Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
10/12/2022
Applicant:
Helen Ormsby
Description:
SFR DRHOH35D21 T21-M0044

Permit Reviews

Permit Number - T22CM07812
Permit Status: Issued
Permit Description: SFR DRHOH35D21 T21-M0044
Start Date Submittal Complete Date Status  
06/02/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/02/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T22CM07812
Permit Status: Issued
Permit Description: SFR DRHOH35D21 T21-M0044
Total Outstanding Activity Conditions - 2
Date Name
10/12/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
10/12/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2018-112(P21WP00113) IS ACCEPTED ANDRELEASED BY PCRWRD

Conditions

Permit Number - T22CM07812
Permit Status: Issued
Permit Description: SFR DRHOH35D21 T21-M0044
Date Description Comments
10/12/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM07812
Permite Description: SFR DRHOH35D21 T21-M0044
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
04/05/2023 COT - RSBU - Exterior Clips/Sheathing N/A Not Ready Not ready. Missing double studs on bearing points of girders. Total of 5 studs. 4/5/2023
04/05/2023 COT - RSBU - Roof Nailing N/A Not Ready
04/05/2023 COT - LCBU - Framing N/A Not Ready
07/24/2023 ENGR Engineering Final N/A Partial Pass ADA compliance not verified will reschedule tomorrow.

Completed Inspections

Permit Status: Issued
Permit Number: T22CM07812
Permit Description: SFR DRHOH35D21 T21-M0044
Total Completed Inspections - 23
Date Description Inspector Results Comments
02/28/2023 COT - RSPL - Yard Water Line Passed
02/28/2023 COT - RSPL - Rough Soil Passed
02/28/2023 COT - RSPL - Sewer Passed
03/24/2023 COT - RSBU - Preslab Passed
03/24/2023 COT - RSEL - Grounding/Bonding Passed
03/24/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
03/24/2023 COT - RSEL - Electrical Underground Passed
04/06/2023 COT - RSBU - Exterior Clips/Sheathing Passed Approved. Corrections were made. 4/6/2023
04/06/2023 COT - RSBU - Roof Nailing Passed
04/11/2023 COT - RSEL - Construction Power Passed
04/11/2023 BULD - Electrical Clearance Passed TEP ECO
04/27/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/27/2023 COT - RSPL - Gas Pressure Test Passed
04/27/2023 COT - LCPL - Plumbing Intermediate Passed
04/27/2023 RSME - Mechanical Progress Passed
04/27/2023 COT - LCBU - Framing Passed
05/12/2023 COT - HCBU - Interior Shear Bracing Passed
06/29/2023 COT - BULD - SWG Clearance Passed SWG for meter only
07/24/2023 COT - RSEL - Outdoor Lighting Passed
07/24/2023 COT - RSEL - Electrical Final Passed
07/25/2023 COT - RSPL - Plumbing Final Passed
07/25/2023 RSBU - Building Final Passed
07/25/2023 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SVB 27 PT REPORT-2023-05-31_V1.PDF DOCUMENTS VIEW
SVB 27 SIC-2023-05-31_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW