Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
10/12/2022
Applicant:
Dana Petty
Description:
SFR MER1301600 T21-M0073

Outstanding Activity Conditions

Permit Number - T22CM07809
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073
Total Outstanding Activity Conditions - 3
Date Name
10/12/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
10/12/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/12/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2020-095/P22WP00021 IS ACCEPTED AND RELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM07809
Permite Description: SFR MER1301600 T21-M0073
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
01/03/2023 COT - RSPL - Rough Soil N/A Canceled Inspection completed yesterday.
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM07809
Permit Description: SFR MER1301600 T21-M0073
Total Completed Inspections - 22
Date Description Inspector Results Comments
06/27/2023 COT - RSPL - Yard Water Line Passed
01/10/2023 COT - RSEL - Grounding/Bonding Passed
01/10/2023 COT - RSBU - Preslab Passed
01/10/2023 COT - RSEL - Electrical Underground Passed
01/27/2023 COT - RSBU - Exterior Clips/Sheathing Passed
01/27/2023 COT - RSBU - Roof Nailing Passed
03/01/2023 RSME - Mechanical Progress Passed
03/01/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/01/2023 COT - LCPL - Plumbing Intermediate Passed
03/01/2023 COT - RSEL - Construction Power Passed
03/01/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
03/01/2023 COT - LCBU - Framing Passed
03/01/2023 COT - RSPL - Gas Pressure Test Passed
03/17/2023 COT - HCBU - Interior Shear Bracing Passed
03/30/2023 COT - RSPL - Sewer Passed
05/22/2023 COT - BULD - SWG Clearance Passed 5/22/23: SWG clearance issued.
05/22/2023 COT - RSPL - Plumbing Final Passed
06/14/2023 ENGR Engineering Final Passed
06/14/2023 COT - RSEL - Electrical Final Passed AFCI & GFCI breakers are installed in electrical panel, panel is properly labeled. Electrical outlets and fixtures are installed and operational. Smoke detectors are functioning properly.
06/14/2023 COT - RSEL - Outdoor Lighting Passed Outdoor lighting fixtures are installed and operational with the correct size light bulb for wattage.
06/14/2023 COT - RSME - Mechanical Final Passed Mechanical equipment is installed and operational. A/C registers are installed. Thermostat is installed and operational.
06/14/2023 RSBU - Building Final Passed Construction is complete on this house. Plumbing, electrical, and mechanical are all working well. Okay to issue a Certificate of Occupancy.

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW