Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM07690
Permit Details
Status:
Needs Resubmittal
Type:
Residential Building - One or Two Family
Address:
1915 E LIND RD
Address NEW:
1915 E LIND RD
Apply Date:
10/07/2022
Applicant:
Description:
Convert Storage to Sleeping Quarters
Permit Reviews
Permit Number - T22CM07690
Permit Status: Needs resubmittal
Permit Description: Convert Storage to Sleeping Quarters
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/07/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 10/17/2022 | ACTIVE |
| 10/29/2022 | RESIDENTIAL NEW DWELLING v.1 | 11/21/2022 | APPROVED |
| 01/31/2024 | RESIDENTIAL NEW DWELLING v.1 | 03/04/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Needs Resubmittal
Permit Number: T22CM07690
Permite Description: Convert Storage to Sleeping Quarters
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/12/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Provide DWV test. Revise plans on both windows and stove. Along with the hallway having a clearance at 36" finish. 10/12/2023 |
| 05/09/2025 | COT - RSEL - Electrical Final | N/A | Not Ready |
Completed Inspections
Permit Status: Needs Resubmittal
Permit Number: T22CM07690
Permit Description: Convert Storage to Sleeping Quarters
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2023 | COT - RSPL - Rough Soil | Passed | Plumbing rough-in is complete and under water test. Okay to backfill and pour concrete floor back. | |
| 06/26/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 10/03/2024 | COT - BULD - SWG Clearance | Passed | ||
| 10/03/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 09/08/2025 | RSBU - Building Final | Passed |