Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
10/06/2022
Applicant:
Helen Ormsby
Description:
SFR DRHOH30K21 T21-M0046

Permit Reviews

Permit Number - T22CM07684
Permit Status: Issued
Permit Description: SFR DRHOH30K21 T21-M0046
Start Date Submittal Complete Date Status  
06/26/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 06/27/2023 APPROVED Review Details
06/14/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/23/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - T22CM07684
Permit Status: Issued
Permit Description: SFR DRHOH30K21 T21-M0046
Total Outstanding Activity Conditions - 2
Date Name
10/06/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
10/06/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2018-112(P21WP00113) IS ACCEPTED ANDRELEASED BY PCRWRD

Conditions

Permit Number - T22CM07684
Permit Status: Issued
Permit Description: SFR DRHOH30K21 T21-M0046
Date Description Comments
10/06/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/22/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/22/2023 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
06/22/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM07684
Permite Description: SFR DRHOH30K21 T21-M0046
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready
04/18/2023 COT - LCBU - Framing N/A Partial Pass Partial per intermediates. 4/18/2023

Completed Inspections

Permit Status: Issued
Permit Number: T22CM07684
Permit Description: SFR DRHOH30K21 T21-M0046
Total Completed Inspections - 23
Date Description Inspector Results Comments
03/17/2023 COT - RSPL - Yard Water Line Passed
03/17/2023 COT - RSPL - Sewer Passed
03/17/2023 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required.
03/27/2023 COT - RSEL - Grounding/Bonding Passed
03/27/2023 COT - RSBU - Preslab Passed Rebar per plans okay for concrete in slab. 3/27/2023
03/27/2023 COT - RSEL - Electrical Underground Passed
03/27/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar per plans okay for concrete in slab. 3/27/2023
04/18/2023 COT - RSBU - Exterior Clips/Sheathing Passed
04/18/2023 COT - RSEL - Construction Power Passed Clearance for TEP ECO. 4/18/2023
04/18/2023 COT - RSBU - Roof Nailing Passed
05/10/2023 COT - LCPL - Plumbing Intermediate Passed
05/10/2023 RSME - Mechanical Progress Passed
05/10/2023 COT - RSPL - Gas Pressure Test Passed
05/11/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/18/2023 COT - HCBU - Interior Shear Bracing Passed
07/21/2023 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 7/21/2023
07/28/2023 COT - RSPL - Plumbing Final Passed
07/28/2023 COT - RSEL - Electrical Final Passed
07/28/2023 COT - RSME - Mechanical Final Passed
07/28/2023 COT - RSEL - Outdoor Lighting Passed
07/28/2023 ENGR Engineering Final Passed
01/11/2024 RSBU - Building Final Passed Duplicate inspection. 1/11/2024
06/25/2024 COT - LCBU - Framing Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SVB 31 PT REPORT-2023-06-13_V1.PDF DOCUMENTS VIEW
SVB 31 SIC-2023-06-13_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW